KB-3BA0

GPT Review — P10B-1B D32 Package PASS and P10B-1C Directive

4 min read Revision 1
s188p10bp10b-1bp10b-1cd32package-passexecute-directive

GPT Review — P10B-1B D32 Package PASS and P10B-1C Directive

Date: 2026-04-29

Verdict

P10B-1B: PASS.

The read-only package generation completed successfully and meets the guardrails set after the hardcode incident.

Do not execute yet. Opus must draft a separate P10B-1C execution prompt for final review.

Accepted evidence

  • Source SHA verified: a42622496fff8c725932a5d310d1e4050e63e41828ba01c1eec4974c045e17f7.
  • candidate-units.json: 23 units, full body, 23/23 body hashes match.
  • Schema discovery: 54 columns across 4 target tables.
  • Collision: publication=0, LU=0.
  • Vocab: all required vocab families verified.
  • Role: directus has INSERT on all 4 target tables.
  • Triggers: 6 documented; BG-UV-02 block handled via description stub.
  • SQL files generated from JSON and hashed.
  • Generator scripts retained and hashed.
  • Hardcode audit: PASS, no enumerated unit arrays in generation logic.
  • No production mutation.

Decisions on five points

D1 — description = title stub

ACCEPT FOR MVP.

This is conservative and satisfies BG-UV-02. It is acceptable for P10B. Record follow-up for richer Đ43-style descriptions.

D2 — risk_tier = medium

ACCEPT FOR MVP if the value is valid under production CHECK/vocab and was generated by the package. Do not change in execution prompt unless schema check fails.

D3 — owner = incomex_council

ACCEPT FOR MVP if the value satisfies the current schema/check constraints. Record follow-up for canonical owner registry if needed.

D4 — ROLLBACK → COMMIT

ACCEPT ONLY IN P10B-1C execution prompt after fresh preflight and SHA verification.

The execution prompt must copy the package to a run-specific file, replace final ROLLBACK; with COMMIT;, verify the run-file SHA after replacement, and keep the original package file unchanged.

D5 — doc_registry gate

No blocker found in P10B-1B evidence.

Proceed, but P10B-1C preflight must still re-check triggers/gates status and stop on drift.

Required P10B-1C execution prompt guardrails

Opus should draft P10B-1C — D32 Execute + Render v0.1.

Scope:

  • execute approved package for DIEU-32 only;
  • render clean human-readable markdown;
  • diff against original;
  • upload deliverables;
  • STOP.

Required guardrails:

  1. Fresh preflight:

    • current DB/user;
    • schema count unchanged;
    • triggers enabled;
    • collisions still 0;
    • source SHA match;
    • candidate JSON SHA match;
    • SQL package SHAs match P10B-1B report;
    • backup/snapshot evidence.
  2. Do not edit original package SQL in place:

    • copy insert-candidate.sql to /tmp/p10b-1c-d32-insert-run.sql;
    • replace final ROLLBACK; with COMMIT; only in run file;
    • confirm original still ends with ROLLBACK;;
    • confirm run file ends with COMMIT;.
  3. Execute once:

    • psql -v ON_ERROR_STOP=1 -X;
    • capture output log;
    • extract pub_id UUID robustly;
    • verify pub_id exists.
  4. Post-commit verification:

    • expected 1 publication + 23 LU + 23 UV + 23 PM;
    • lifecycle mutable: publication proposed, UV draft;
    • no enacted.
    • If mismatch after commit: STOP + report IDs; do not auto-rollback.
  5. Render:

    • run approved render SQL;
    • save raw TSV;
    • convert to clean markdown;
    • skip synthetic root and placeholder bodies;
    • preserve human-readable text.
  6. Diff and deliverables:

    • original.md;
    • reconstructed-clean.md;
    • diff-report.md;
    • tree-report.md;
    • row-count-report.md;
    • rollback-instructions.md;
    • execute report.
  7. Hard exclusions:

    • no DDL;
    • no seed/role/permission/token changes;
    • no Nuxt/KG/vector;
    • no broad migration;
    • no lifecycle promotion to enacted;
    • no auto-rollback after committed mismatch.

Status

  • P10B-1A: PASS.
  • P10B-1A-HASH: PASS.
  • P10B-1B package: PASS.
  • Next: Opus drafts P10B-1C execution prompt for review.
  • Execution is not yet authorized until P10B-1C prompt is reviewed.
Back to Knowledge Hub knowledge/dev/reports/gpt-review-p10b-1b-d32-package-pass-and-p10b-1c-directive-2026-04-29.md