KB-1FC4
GPT Review — Opus Post-G6 Ledger and Wrapper Update
2 min read Revision 1
gptreviewg6post-passledgerwrapperg8dieu38
GPT Review — Opus Post-G6 Ledger and Wrapper Update
Date: 2026-04-28
Verdict
PASS. Opus correctly executed the immediate post-G6 actions:
- Updated the ledger/index to mark G6 PASS and P9 Gate progress 10/12.
- Persisted the G6 retry wrapper as archival/as-built dry-run operational evidence.
- Did not start G8, G11, Directus role mutation, or P9 production migration.
Governance check
| Rule | Result | Finding |
|---|---|---|
| Hiến pháp / Zero Trust | PASS | G6 accepted with evidence; no unapproved next gate started. |
| Đ32 | PASS | Next mutations still require separate gate. |
| Đ33 | PASS | G6 remains dry-run evidence, not production migration. |
| Đ35 | PASS | G8/G11/DOT-governed flow remains pending. |
| Đ24 | PASS | No label/entity-label mutation. |
Direction
Next action should be a compact G6 PASS → Production Candidate Pack / G8 Readiness planning block, not immediate G8 execution.
Opus should draft one package containing:
- G6 PASS evidence summary.
- Reusable artifacts from G6 run #4: DDL, functions/triggers, seeds, verification harness, rollback checks.
- Dry-run scaffolding to remove before production:
p9_g6_dryrun, run-specific wrapper/probe paths, smoke-test notes. - G8 Directus roles/permissions readiness plan.
- Explicit statement: no Directus role/permission mutation until GPT/User gate.
After drafting, upload to KB and stop for GPT/User review.