KB-1FC4

GPT Review — Opus Post-G6 Ledger and Wrapper Update

2 min read Revision 1
gptreviewg6post-passledgerwrapperg8dieu38

GPT Review — Opus Post-G6 Ledger and Wrapper Update

Date: 2026-04-28

Verdict

PASS. Opus correctly executed the immediate post-G6 actions:

  1. Updated the ledger/index to mark G6 PASS and P9 Gate progress 10/12.
  2. Persisted the G6 retry wrapper as archival/as-built dry-run operational evidence.
  3. Did not start G8, G11, Directus role mutation, or P9 production migration.

Governance check

Rule Result Finding
Hiến pháp / Zero Trust PASS G6 accepted with evidence; no unapproved next gate started.
Đ32 PASS Next mutations still require separate gate.
Đ33 PASS G6 remains dry-run evidence, not production migration.
Đ35 PASS G8/G11/DOT-governed flow remains pending.
Đ24 PASS No label/entity-label mutation.

Direction

Next action should be a compact G6 PASS → Production Candidate Pack / G8 Readiness planning block, not immediate G8 execution.

Opus should draft one package containing:

  • G6 PASS evidence summary.
  • Reusable artifacts from G6 run #4: DDL, functions/triggers, seeds, verification harness, rollback checks.
  • Dry-run scaffolding to remove before production: p9_g6_dryrun, run-specific wrapper/probe paths, smoke-test notes.
  • G8 Directus roles/permissions readiness plan.
  • Explicit statement: no Directus role/permission mutation until GPT/User gate.

After drafting, upload to KB and stop for GPT/User review.