GPT Review — G11 P9 User Final Approval Evidence Pack v0.1
GPT Review — G11 P9 User Final Approval Evidence Pack v0.1
Date: 2026-04-29
Verdict
PASS WITH SMALL WORDING PATCHES — v0.2 required before asking User approval.
The evidence pack is directionally correct and no major constitutional/law conflict is found. However, a few phrases must be tightened to avoid status inflation and accidental authorization of future work.
Law / constitutional check
No blocking conflict after wording patches.
- Hiến pháp / User approval: aligned. G11 is evidence review and approval only, no mutation.
- Điều 38 / LSL-01: aligned. The pack correctly frames TAC as PG-governed information-unit foundation.
- Điều 33 / PostgreSQL SSOT: aligned. PG remains SSOT; Directus/GSM are support surfaces.
- Gate separation: mostly aligned, but wording must not imply corpus migration, Nuxt/Pivot, or KG/vector execution is approved by G11.
- Zero Trust: evidence is mostly grounded in logs; ensure exact log paths are retained where possible.
Accepted points
- Correctly states P9 is 11/12 and G11 is the last approval gate.
- Correctly includes Gate A, Trigger Guard repair, Gate B, Gate C, G8B-RP, G8B-Token evidence.
- Correctly lists production state: 14 tables, 7 functions, 6 triggers, 14 collections, 61 seed rows, 84 permissions, 2 users, 2 GSM tokens.
- Correctly states no corpus migration, no Nuxt/Pivot implementation, no KG/vector sync.
- Correctly lists post-G11 follow-ups.
Required patches for v0.2
Patch 1 — Approval must not authorize execution of follow-up work
Current wording says approval allows moving into the next operational phase: corpus migration, Nuxt rendering, KG sync. This can be interpreted as authorizing those executions.
Replace with:
Approval confirms P9 production deployment of the Điều 38 TAC foundation is complete and allows separate design/review gates to be opened for follow-up work. It does not authorize execution of corpus migration, Nuxt/Pivot rendering, or KG/vector sync.
Patch 2 — Separate original P9 gates from S186 production sub-gates
The evidence table mixes original P9 gates (G1–G12) with production rollout gates (Gate A/B/C, G8B-RP, G8B-Token), resulting in 17 rows while saying P9 is 12 gates.
v0.2 should split into two tables:
- P9 Gate Status: G1–G12, with G8 = PASS and G11 pending.
- S186 Production Rollout Evidence: Gate A, Trigger Guard repair, Gate B, Gate C, G8B-RP, G8B-Token.
This avoids confusion and status inflation.
Patch 3 — Add exact action log references for critical S186 gates
Use exact paths where available:
knowledge/dev/laws/dieu38-trien-khai/reports/p9-gate-c-seed-log-2026-04-28.mdknowledge/dev/laws/dieu38-trien-khai/reports/p9-g8b-rp-readonly-reverify-2026-04-29.mdknowledge/dev/laws/dieu38-trien-khai/reports/p9-g8b-token-provisioning-log-2026-04-29-run4.md
If a Gate A/Gate B/Trigger Guard log path is abbreviated, mark it as abbreviated or replace with exact known path.
Patch 4 — Clarify G11 outcome
After User approval:
- mark P9 12/12 PASS;
- mark Điều 38 TAC foundation production-ready;
- do not mark broad corpus migration / Nuxt / KG as launched.
Patch 5 — Add “approval options” without personal salutation if this is stored as canonical artifact
For KB canonical artifact, prefer neutral wording:
User may approve, reject, or request additional verification.
The personal salutation can be used in chat, but canonical evidence pack should be reusable.
Directive to Opus 4.6
Patch G11 Evidence Pack v0.1 → v0.2 with the five wording/structure patches above.
Do not add new verification unless User requests it. Do not run Agent. Do not mutate production. Return v0.2 for GPT final review, then it can be presented to User for final approval.
Current state
- Gate A: PASS.
- Trigger Guard DROP Repair: PASS.
- Gate B: PASS.
- Gate C: PASS.
- G8B-RP: PASS, reverified.
- G8B-Token: PASS.
- Full G8: PASS.
- G11 evidence pack v0.1: needs small wording/structure patch before User approval.