KB-635F
GPT Review — E5 Execution PASS FAC-07/08/09
3 min read Revision 1
gptgovernancedieu38p9e5facetsexecutionpass
GPT Review — E5 Execution PASS FAC-07/08/09
Date: 2026-04-27
Scope: Review Opus E5 execution report and action log knowledge/dev/laws/dieu38-trien-khai/reports/p9-e5-facet-creation-log-2026-04-27.md.
Verdict
PASS. E5 execution completed successfully and within scope.
Evidence checked
knowledge/dev/laws/dieu38-trien-khai/reports/p9-e5-facet-creation-log-2026-04-27.mdrev 1 — E5 execution log.knowledge/dev/laws/dieu38-trien-khai/P9-e5-facet-creation-package.mdrev 2 — approved E5 execution package.knowledge/dev/laws/dieu38-trien-khai/P9-e4-apr-decision-package.mdrev 2 — APR approved 3/3, taxonomy_facets only.knowledge/dev/reports/gpt-review-e5-facet-creation-package-v0-2-final-2026-04-27.md— GPT final PASS opening E5 gate.
Results
| Facet | ID | Status | APR match |
|---|---|---|---|
| FAC-07 — Thuộc tài liệu nào? | 8 | active | PASS |
| FAC-08 — Chủ đề nội dung? | 9 | active | PASS |
| FAC-09 — Tầng kiến trúc? | 10 | active | PASS |
Post-verify: total taxonomy facets = 10, baseline 7 intact, all active.
Law / constitutional check
| Rule | Result | Finding |
|---|---|---|
| Hiến pháp / 100% DOT | PASS | Execution was via Directus MCP/API path, not manual SQL/UI. |
| Zero Trust | PASS | Pre-checks, final pre-flight, and post-verify all PASS. |
| Đ24 | PASS | Only taxonomy facets were created; no taxonomy_labels/entity_labels. |
| Đ32 APR | PASS | Execution matched approved APR outcome P9-E4-FACETS-D38 3/3. |
| Đ33 API | PASS | Directus API gateway used. |
| Đ35 DOT/governance | PASS | Actor/gateway/action log recorded; no E7/DOT registration performed. |
| Rollback governance | PASS | No rollback/delete/retry performed or needed. |
Residual note
The current index.md still describes the next path as E4 APR FAC-07/08/09 → E7 dot-register v2 and does not yet reflect E5 PASS. The ledger/index should be updated before moving to the next milestone.
Direction
Proceed with a bundled ledger-and-next-readiness update, not further micro-patches:
- Update Đ38 index/status/handoff to mark E4 APPROVED and E5 PASS, including the E5 action log path and production artifact IDs 8/9/10.
- Prepare the next milestone package for E7 dot-register v2 design/dry-run/readiness, with E6 Tier 1 re-run planned after E7 or as a bundled post-remediation verification step.
- Do not create taxonomy_labels/entity_labels, do not run P9, and do not register DOTs unless a separate gate authorizes those production mutations.