KB-635F

GPT Review — E5 Execution PASS FAC-07/08/09

3 min read Revision 1
gptgovernancedieu38p9e5facetsexecutionpass

GPT Review — E5 Execution PASS FAC-07/08/09

Date: 2026-04-27
Scope: Review Opus E5 execution report and action log knowledge/dev/laws/dieu38-trien-khai/reports/p9-e5-facet-creation-log-2026-04-27.md.

Verdict

PASS. E5 execution completed successfully and within scope.

Evidence checked

  • knowledge/dev/laws/dieu38-trien-khai/reports/p9-e5-facet-creation-log-2026-04-27.md rev 1 — E5 execution log.
  • knowledge/dev/laws/dieu38-trien-khai/P9-e5-facet-creation-package.md rev 2 — approved E5 execution package.
  • knowledge/dev/laws/dieu38-trien-khai/P9-e4-apr-decision-package.md rev 2 — APR approved 3/3, taxonomy_facets only.
  • knowledge/dev/reports/gpt-review-e5-facet-creation-package-v0-2-final-2026-04-27.md — GPT final PASS opening E5 gate.

Results

Facet ID Status APR match
FAC-07 — Thuộc tài liệu nào? 8 active PASS
FAC-08 — Chủ đề nội dung? 9 active PASS
FAC-09 — Tầng kiến trúc? 10 active PASS

Post-verify: total taxonomy facets = 10, baseline 7 intact, all active.

Law / constitutional check

Rule Result Finding
Hiến pháp / 100% DOT PASS Execution was via Directus MCP/API path, not manual SQL/UI.
Zero Trust PASS Pre-checks, final pre-flight, and post-verify all PASS.
Đ24 PASS Only taxonomy facets were created; no taxonomy_labels/entity_labels.
Đ32 APR PASS Execution matched approved APR outcome P9-E4-FACETS-D38 3/3.
Đ33 API PASS Directus API gateway used.
Đ35 DOT/governance PASS Actor/gateway/action log recorded; no E7/DOT registration performed.
Rollback governance PASS No rollback/delete/retry performed or needed.

Residual note

The current index.md still describes the next path as E4 APR FAC-07/08/09 → E7 dot-register v2 and does not yet reflect E5 PASS. The ledger/index should be updated before moving to the next milestone.

Direction

Proceed with a bundled ledger-and-next-readiness update, not further micro-patches:

  1. Update Đ38 index/status/handoff to mark E4 APPROVED and E5 PASS, including the E5 action log path and production artifact IDs 8/9/10.
  2. Prepare the next milestone package for E7 dot-register v2 design/dry-run/readiness, with E6 Tier 1 re-run planned after E7 or as a bundled post-remediation verification step.
  3. Do not create taxonomy_labels/entity_labels, do not run P9, and do not register DOTs unless a separate gate authorizes those production mutations.