KB-6228

GPT Final Review — G8B-RP Directus Roles/Permissions v0.2

4 min read Revision 1
s186gpt-final-reviewg8b-rpdirectusrolespermissionsdieu38p9passuser-go-required

GPT Final Review — G8B-RP Directus Roles/Permissions v0.2

Date: 2026-04-28

Verdict

PASS — READY FOR USER GO.

G8B-RP v0.2 is sufficiently safe and aligned for Agent execution after explicit User GO.

Important clarification

G8B-RP means Roles / Policies / Permissions only. It does not complete full G8B/P9 G8 because token provisioning is deferred.

After G8B-RP passes, the prompt/design should be saved to KB as the reference execution artifact. The Agent action log will be the execution evidence. Token provisioning must be handled by a separate follow-up gate before G11 if full G8B/P9 G8 requires tokens.

Reviewed material

  • Opus report: v0.2 patched per GPT 4 findings.
  • Prompt: G8B-RP — Directus TAC Roles/Policies/Permissions Execution Prompt v0.2.
  • Canonical design: knowledge/dev/laws/dieu38-trien-khai/P9-G8A-directus-roles-readiness-design.md v0.3.
  • Prior review: knowledge/dev/reports/gpt-review-g8b-directus-roles-permissions-prompt-v0-1-2026-04-28.md.

Law / constitutional check

No blocking conflict found.

  • Hiến pháp / User-gated production: aligned if execution waits for explicit User GO.
  • Điều 38 / LSL-01: aligned. G8B-RP grants governed access to TAC schema for PG-governed information units.
  • Điều 33: aligned. PostgreSQL remains SSOT; this gate does not mutate public.tac_* truth data.
  • Directus 11 model: aligned. Role → Access → Policy → Permissions.
  • Gate separation: aligned. No DDL, no seed/data mutation, no G11, no migration, no Nuxt.
  • Token governance: aligned only because token provisioning is explicitly deferred and not falsely claimed.

Accepted v0.2 patches

  1. Permission count is now consistent: 84 total = 28 agent + 56 admin.
  2. Gate is explicitly named G8B-RP and does not claim full G8B/P9 G8 PASS.
  3. Idempotency/classification is safer: clean/exact/partial/unknown states are handled without blanket delete.
  4. Full matrix verification is now required using 84 expected tuples vs actual tuples.

Minor execution notes, not blockers

  • If existing exact match is detected, action log must clearly state which objects were skipped as already satisfied.
  • If any extra permission exists on tac_* outside the 84 tuple set, this is a FAIL unless explicitly explained as unrelated and approved.
  • If token provisioning is requested during execution, Agent must refuse/defer and stop within G8B-RP scope.

Directive to Opus 4.6

Proceed to User GO request / dispatch preparation.

Do not patch another prompt version unless User requests it.

Also save the final G8B-RP v0.2 prompt/design into KB as a reference document before or with dispatch package, using a path such as:

knowledge/dev/laws/dieu38-trien-khai/P9-G8B-RP-directus-roles-permissions-execution-prompt-v0-2.md

Then, after explicit User GO, dispatch Claude Code / Agent to execute v0.2.

Agent execution guardrails

If User gives GO:

  • Executor: Claude Code via SSH contabo.
  • Effort: medium.
  • Scope: G8B-RP only.
  • Execute v0.2 exactly.
  • Stop after action log upload.
  • No token provisioning.
  • No DDL.
  • No public.tac_* seed/data mutation.
  • No Directus collection metadata changes.
  • No registry/birth/catalog/DOT writes.
  • No G11.
  • No corpus migration.
  • No Nuxt/Pivot work.

Expected action log:

knowledge/dev/laws/dieu38-trien-khai/reports/p9-g8b-directus-roles-permissions-log-YYYY-MM-DD.md

Current state

  • Gate A Production DDL: PASS.
  • Trigger Guard DROP Repair: PASS.
  • Gate B Directus Collections: PASS.
  • Gate C Seed 61 Rows: PASS.
  • G8B-RP prompt v0.2: PASS, awaiting User GO for execution.
  • Token gate: still required/deferred before full G8B/P9 G8, unless User decides otherwise.
  • G11/Nuxt/Migration/KG sync: not authorized yet.