KB-5751

GPT Final Review — G11 P9 User Final Approval Evidence Pack v0.2

3 min read Revision 1
s186gpt-final-reviewg11p9final-approvalpassdieu38

GPT Final Review — G11 P9 User Final Approval Evidence Pack v0.2

Date: 2026-04-29

Verdict

PASS — READY FOR USER APPROVAL.

G11 Evidence Pack v0.2 is suitable to present to User for final approval.

Reviewed input

  • G11 — P9 User Final Approval Evidence Pack v0.2 from Opus 4.6.
  • Prior review: knowledge/dev/reports/gpt-review-g11-p9-user-final-approval-evidence-pack-v0-1-2026-04-29.md.
  • Full G8 confirmation: knowledge/dev/reports/gpt-confirm-full-g8-pass-and-opus-next-directive-g11-2026-04-29.md.

Law / constitutional check

No blocking conflict found.

  • Hiến pháp / User approval: aligned. G11 is final evidence review and approval only, with no mutation.
  • Zero Trust: aligned. Evidence is grounded in named logs and state snapshots.
  • Điều 38 / LSL-01: aligned. Approval is scoped to the TAC foundation for PG-governed information units.
  • Điều 33 / PostgreSQL SSOT: aligned. PG remains SSOT; Directus/GSM are gateway/access infrastructure.
  • Gate separation: aligned. Approval does not authorize corpus migration, Nuxt/Pivot rendering, KG/vector sync, role expansion, or future execution work.

Accepted v0.2 patches

  1. Approval meaning is now scoped to TAC foundation production readiness.
  2. Approval explicitly does not authorize migration/Nuxt/KG execution.
  3. P9 G1–G12 gate status is separated from S186 rollout evidence.
  4. Exact action log references for the six critical rollout gates are included.
  5. Follow-ups are listed as separately gated, not part of P9.
  6. Approval wording is neutral and canonical.

Minor non-blocking note

After User approval, update index.md and create the S186 → S187 handoff. Do not include any production mutation in those documentation updates.

Directive to Opus 4.6

Proceed to present G11 Evidence Pack v0.2 to User for approval.

No additional patch is required.

If User approves with the exact or equivalent wording:

Approve P9 production deployment complete — Điều 38 TAC foundation production-ready.

Then perform documentation-only closeout:

  1. Update knowledge/dev/laws/dieu38-trien-khai/index.md:
    • G11 PASS;
    • P9 = 12/12 PASS;
    • Điều 38 TAC foundation production-ready.
  2. Create S186 → S187 handoff.
  3. Do not perform corpus migration, Nuxt/Pivot rendering, KG/vector sync, role changes, token changes, or production mutation.

If User rejects or requests more verification, follow User direction.

Current state

  • Gate A: PASS.
  • Trigger Guard DROP Repair: PASS.
  • Gate B: PASS.
  • Gate C: PASS.
  • G8B-RP: PASS.
  • G8B-Token: PASS.
  • Full G8: PASS.
  • G11 pack v0.2: PASS, awaiting User approval.
Back to Knowledge Hub knowledge/dev/reports/gpt-final-review-g11-p9-user-final-approval-evidence-pack-v0-2-2026-04-29.md