GPT Decision S190 — P10B COMPLETE confirmed, S188 closeout direction
GPT Decision S190 — P10B COMPLETE confirmed, S188 closeout direction
Date: 2026-04-30
Phase: TAC MVP / P10B
Decision: P10B COMPLETE confirmed. S188 closeout approved.
1. Evidence read / checked
Read directly:
knowledge/dev/laws/dieu38-trien-khai/reports/p10b-2c-r2-followup-d28-2026-04-30.mdknowledge/dev/laws/dieu38-trien-khai/reports/p10b-2c-r2-d28-execute-report-2026-04-30.md
Checked prior PASS evidence via KB search / existing GPT decisions:
knowledge/dev/reports/gpt-review-p10b-1c-d32-pass-and-next-direction-2026-04-29.md- Handoff/roadmap evidence for P10A D35 PASS.
2. D28 confirmation
D28 P10B-2 is accepted as PASS.
Confirmed from follow-up report:
- Gate 0 SSH VPS PASS: runtime DB identity
directus/directus. - Publication:
cf8d4dc0-3d70-55f8-8c35-e01da101d710,DIEU-28/v2.0, lifecycleproposed. - Counts: pub=1, LU=27, UV=27, PM=27.
- BG-UV-02 live: has_desc=20, null_desc=7.
- Corrected lifecycle query: UV
draft=27. - Render produced 27 rows.
- Normalized diff: IDENTICAL, 0 content drift.
- Tree report: 27 rows, render order 0..26.
- Deliverables uploaded through Agent Data API.
- No rollback executed.
- P10B was not closed out by Agent, as required.
The unified diff only showed final newline difference; normalized content drift is 0.
3. P10B complete confirmation
P10B multi-document validation is accepted as COMPLETE.
Validated documents:
| Document | Units | Result |
|---|---|---|
| D35 v5.2 / P10A | 36 | PASS, 0 content drift |
| D32 v1.1 / P10B-1 | 23 | PASS, 0 content drift |
| D28 v2.0 / P10B-2 | 27 | PASS, 0 content drift |
Total validated units: 86.
This proves TAC MVP round-trip across:
- large law document;
- smaller law document;
- medium document with Roman numerals, SQL/PLpgSQL code fences, tables, footer, and birth-gate-sensitive descriptions.
4. Law / constitution check
No conflict found with current constraints:
- VPS remained runtime/DB SSOT; access was through verified SSH.
- KB remained artifact/report SSOT.
/tmpwas treated as ephemeral workspace only.- KB uploads used Agent Data API, not direct SQL against
kb_documents. - No unauthorized rollback was executed.
- D28 mutation was gated by REGEN-PROMOTE, PF-R2, Execute R2, and read-only follow-up.
- Known failure modes generated permanent guardrails: manifest/read-back, SSH Gate 0, birth-gate matrix, PF before execute, qualified SQL checks, flow-control markers.
Note: D28 clean render used one flagged D28-specific renderer rule. This is acceptable for MVP validation/reporting but must become a design input for P10D; production UI renderer must avoid hidden hardcoded section-specific behavior.
5. Direction to Opus
S188 closeout is approved.
Opus should perform a concise closeout, not another technical loop:
- Write S188 → S189 handoff to KB.
- State P10B COMPLETE with links to the final D28 execute/follow-up reports and prior D32/D35 PASS evidence.
- Record lessons as operating guardrails:
/tmpis not inter-machine SSOT;- Mac Agent → SSH VPS is valid control path, VPS remains runtime SSOT;
- birth-gate compliance matrix required before execute package;
- PF inspection required before execute;
- KB manifest + read-back required for cross-machine artifacts;
- prompt SQL must qualify ambiguous columns;
- flow-control marker pattern worked and should remain.
- Set next target: P10D design note / Nuxt Laws Page UX and architecture.
- Do not start implementing P10D in this closeout.
6. P10D direction for next session
Next session should start with P10D design note only, not implementation.
Initial P10D scope:
/knowledge/lawsroute reused;- left tree view, right reader;
- clean reader mode by default;
- admin/reviewer unit-boundary overlay toggle;
- optional debug mode;
- stable unit IDs vs structural position vs human numbering;
- renderer must be generic and avoid hidden D28/D32/D35-specific case-dispatch;
- document object final layer can become its own enriched DB over time;
- production requirements still need User input before implementation workflow.
7. Final status
P10B COMPLETE. S188 closeout approved. P10D is next, deferred to S189 / next session.