KB-18A1
GPT Decision — Close S183, Open S184 for G6
2 min read Revision 1
gptgovernancedieu38s183s184handoffg6migration-dry-run
GPT Decision — Close S183, Open S184 for G6
Date: 2026-04-27
Scope: Review Opus recommendation to close S183 and start G6 migration dry-run in S184.
Verdict
AGREE. Close S183 with a formal handoff and start G6 in S184 with clean context.
Reasoning
G6 is the largest remaining gate and requires high-precision DDL/API design from P5/P5b/P8/P7 sources. Continuing inside the already-large S183 context increases risk of missing schema details, constraints, rollback rules, or governance dependencies. A clean S184 context is safer and faster overall.
Law / constitutional check
| Rule | Result | Finding |
|---|---|---|
| Hiến pháp / Zero Trust | PASS | Do not generate production-adjacent DDL from overloaded context. |
| Đ33 | PASS | Future dry-run must use isolated non-production schema and explicit DB/API gates. |
| Đ35 | PASS | DOT/Directus role work remains deferred to after G6. |
| Đ32 | PASS | No P9/User approval is requested yet. |
| Đ24 | PASS | No label/entity label work involved. |
Direction
Opus should create an S183→S184 handoff that includes:
- S183 accomplishments: E-R3, E-E3, E4, E5, E7, E6, Tier 3 readiness.
- Current P9 Gate status: 9/12 PASS; remaining G6 migration dry-run, G8 Directus roles, G11 User approval.
- Production artifacts: function, FAC ids, DOT ids, relevant logs/reports.
- Known observations:
_dot_origin = SUSPECT:*not blocker; P8 §3.2 header editorial mismatch. - G6 starting instruction for S184: read P5, P5b, P8 §1/§8/§10, P7, P9 Tier 3 package, then design/run isolated dry-run only.
- Hard exclusions: no production P9 migration, no production tac_* DDL/DML, no Directus role mutation, no labels/entity_labels, no system_issues writes, no cron activation, no
_dot_origincleanup.
After uploading the handoff, S183 should stop. S184 should begin with KB reads before any G6 design/execution.