KB-1736

16 — Final Summary (2026-06-04)

2 min read Revision 1

16 — Final Summary — TOTAL RP Process×Trigger Final Acceptance (2026-06-04)

Outcome

PARTIAL — every safe, additive, evidence-backed branch is complete and dual-path verified against live production. The macro re-derived the entire state from live DB (not from old reports), audited drift (no engineering drift; +25 background births only), finalized all decision packets, and published a self-deriving acceptance scorecard view. No authority was faked.

What is DONE (engineering)

  • Process Axis: 5 fail-closed post-vote handlers + 11 fail-closed candidate handlers; full officialization sequence, side-effect preview, post-vote readiness, owner decision flow, canon gate — all live.
  • Trigger Axis: 525 DB + 77 host census; 7 read-only surfaces; correctly NOT faked into axis_registry.
  • Process×Trigger cross-axis: 7 crosscheck rows + relation/orphan/gap views; new single-pane scorecard.
  • Content: operator manuals, decision packets, D11–D17 backlog, this 18-doc acceptance directory.
  • Production: scanner timer active, executor healthy, dashboards live.

What is BLOCKED (authority only)

  • Official RP 0/453, PROC-OWN-01..05 votes 0 → human-president vote (BLOCKED_AUTHORITY).
  • UI main ahead17/behind13 → operator rebase+PR (BLOCKED_UI_GIT).
  • dot:kg REAL_RUN → owner + dot_config flip + contract promotion (BLOCKED_REALRUN).
  • AX-TRIGGER canon → trigger-axis owner (BLOCKED_AUTHORITY).

The one-sentence truth

The Registries-Pivot Process×Trigger system is fully ready for officialization and production use; every technical branch is done; only true authority actions remain — exactly the open-goal target.

Single live mutation

v_total_final_acceptance_scorecard (birth-free, reversible, dual-path readable).

Next macro

INFORMATION_PIECE_DOTKG_REALRUN_TRIGGER_CANON_AND_FINAL_RP_ACCEPTANCE ‖ UI_DEPLOY_PR_BRANCH (parallel, authority-independent tracks; officialization on standby for president vote).

Back to Knowledge Hub knowledge/dev/reports/architecture/total-rp-process-trigger-officialization-ui-dotkg-content-final-acceptance-2026-06-04/16-final-summary.md