KB-777C

13 — Final Acceptance Scorecard (2026-06-04)

2 min read Revision 1

13 — Final Acceptance Scorecard (2026-06-04)

Backed by live view v_total_final_acceptance_scorecard (applied birth-free this run; dual-path readable). No vague "mostly".

Dimension Status Evidence
Process Axis engineering DONE 5 post-vote + 11 candidate handlers fail-closed; all surfaces live
Trigger Axis engineering DONE 525 DB + 77 host census; 7 surfaces; not faked into axis_registry
UI readiness BLOCKED_UI_GIT main ahead17/behind13; build/lint-clean; operator rebase+PR runbook ready
Official RP readiness BLOCKED_AUTHORITY 0/453; needs PROC-OWN-01..03 president vote
job:cut readiness READY_OWNER sole verified candidate, 8 members; 1 guarded vote from official
dot:kg readiness BLOCKED_REALRUN 2 DRY_RUN/4 SIM/0 REAL_RUN; 5-gate multi-block; real_run_enabled=false
Event readiness BLOCKED_AUTHORITY process.* 0/7 active; PROC-OWN-05
Content readiness DONE operator manuals + packets + D11–D17 backlog published
Production readiness READY_OPERATOR scanner timer active; executor healthy; dashboards live
Governance ownership BLOCKED_AUTHORITY governance_object_ownership = 0
President votes BLOCKED_AUTHORITY PROC-OWN-01..05 votes = 0

Aggregate

Engineering: DONE. Operator: READY (UI + production). Authority: BLOCKED (president + owner + real-run). Overall macro verdict: PARTIAL — engineering frontier fully closed; only true authority actions remain.

Back to Knowledge Hub knowledge/dev/reports/architecture/total-rp-process-trigger-officialization-ui-dotkg-content-final-acceptance-2026-06-04/13-final-acceptance-scorecard.md