KB-388A
11 — Full Content Work & D11–D17 Backlog (2026-06-04)
2 min read Revision 1
11 — Full Content Work & D11–D17 Backlog (2026-06-04)
Content state
The prior closeout published 10 docs under knowledge/dev/content/process-trigger-axis/. This macro adds the operator-facing acceptance layer (this report directory, 18 docs) and the self-deriving scorecard. No source Information-Unit was edited.
Content deliverables (this + prior, consolidated)
- Process Axis operator manual — published (content/process-trigger-axis).
- Trigger Axis operator manual — published.
- Process×Trigger cross-check manual — published (doc 07 + crosscheck views).
- UI deployment handoff manual — doc 04 (exact rebase+PR runbook).
- PROC-OWN decision book — doc 03.
- job:cut officialization packet — doc 08.
- dot:kg real-run packet — doc 09.
- AX-TRIGGER canon packet — doc 06.
- Production readiness guide — doc 12.
- RP final acceptance guide — doc 13 + scorecard view.
- D11–D17 expanded backlog — below.
- Session handoff — doc 14 + checkpoint.
D11–D17 expanded backlog (priority order)
- D11 (P0): human-president PROC-OWN-01..05 vote drain → unblocks official RP + events.
- D12 (P0): UI rebase/PR over diverged main → registries-pivot RP UI live.
- D13 (P1): dot:kg owner (PROC-OWN-04) + dot_config real_run flip → first REAL_RUN.
- D14 (P1): AX-TRIGGER owner → trigger registry canon + 117 trigger→process binding.
- D15 (P2): 6 READY_FOR_OWNER process candidates (BACKUP-DR, PERM-GUARD, RECONCILE, HEALTH-MON, CONTENT-PUBLISH, APPROVAL-LIFECYCLE) → owner drain.
- D16 (P2): 8 residual owner-reconcile dot/bin scripts → register-or-quarantine.
- D17 (P3): dot:kg 10-process split post-REAL_RUN; PIV-340..353 staged-canon decision.
Status
DONE (content) — content materially advanced; backlog prioritized; no source-IU edit.