KB-7074

07 — Post-deploy Smoke (DB-side, deploy pending)

1 min read Revision 1

07 — Post-deploy Smoke

No deploy occurred → HTTP smoke is staged for the operator (11 routes + page, listed in RUNBOOK §2). DB-side smoke remains GREEN and was re-confirmed twice:

  • fn_rp_ui_current_production_acceptance() (now function-backed, OOM-safe): deploy_guard PASS, smoke 15/15, anti-false-green 6/6, invariant real-fail 0, UI_CURRENT_READY_FOR_OPERATOR_DEPLOY.
  • v_rp_ui_current_smoke_probe standalone: 15/15 (incl. AX-PXT grouped node residual-reconcile children count 2, count-grain fix proven).

Post-deploy acceptance criteria: 11 routes return 200/JSON; deploy-guard endpoint PASS; invariant endpoint carries status; a known real-fail node renders critical (no green on invariant fail). NO-GO if deploy guard != PASS or any CRASH_LANDMINE.

Back to Knowledge Hub knowledge/dev/reports/architecture/rp-ui-operator-deploy-decorated-generator-repoint-final-acceptance-2026-06-05/07-post-deploy-smoke.md