KB-1D28

18 — Final Summary

2 min read Revision 1

18 — Final Summary

Final status: PARTIAL. Handoff classification: READY_FOR_OPERATOR_UI_DEPLOY (and, on operator decision, READY_FOR_DECORATED_REPOINT). NOT BLOCKED_BY_OOM. The git divergence is an operator condition, not an engineering failure.

What this macro accomplished:

  • Proved OOM stability from live logs: the last signal-9 was 06:04:02 UTC; the entire window since is crash-free; the function-backed guard times out rather than crashing. v_rp_guard_safety_status OOM_SAFE, 0 landmines.
  • Detected deploy state as NOT_DEPLOYED_OPERATOR_BLOCKED (main on main at c3b353a, container s174 built 05-31 with no rp-current routes); did not fake an HTTP smoke; re-validated the staged 11-route set; DB-side proxy GREEN.
  • Confirmed UI package finality (d04d8e5, routes bind only _current, fail-closed page, patch applies clean onto origin/main re-verified).
  • Advanced the repoint: built and parity-proved a NON-CIRCULAR candidate (decoration from _current_v2), reducing the operator repoint to a single staged statement; decided not to apply (zero upside, operator-authority).
  • Refreshed the function-backed final acceptance dashboard; froze RUNBOOK_v3; documented the read-only watch package; ran the regression and safety audits.

What remains (no engineering blocker):

  • Operator: push/deploy the UI branch; optionally apply the pre-built repoint.
  • Authority: president PROC-OWN vote (official RP); AX-PXT and AX-TRIGGER registration (unlocks no-hardcode); REALRUN flip.

Final verdict: RP_DB_SUPERVISION_READY__OOM_STABLE_NO_NEW_CRASH__NONCIRCULAR_REPOINT_CANDIDATE_PREBUILT__UI_AND_REPOINT_AND_OFFICIALIZATION_OPERATOR_AUTHORITY_GATED.

Back to Knowledge Hub knowledge/dev/reports/architecture/rp-post-deploy-final-acceptance-or-operator-standby-2026-06-05/18-final-summary.md