KB-743E

11 — Post-Repoint Proof

1 min read Revision 1

11 — Post-Repoint Proof

No repoint was performed (Phase 10 decided DO NOT APPLY), so the requirement is to verify that current production remains green. It does:

  • Deploy guard fn_rp_ui_deploy_final_readiness_guard(): PASS, contract 87 = expected 87, invariant real-fail 0, static stale 0, stale_v1 0, alias 7/7, smoke 15/15, anti-false-green 6/6, generated_v2 87, db_side_ready true, verdict UI_DEPLOY_BLOCKED_BY_GIT.
  • Production acceptance fn_rp_ui_current_production_acceptance(): PASS, 15/15, 6/6, UI_CURRENT_READY_FOR_OPERATOR_DEPLOY.
  • OOM detector: 0 CRASH_LANDMINE; guard safety OOM_SAFE.
  • Production _current, _current_v2, and the v1 sentinel are untouched.

The additive non-circular candidate sits beside production without altering it.

Back to Knowledge Hub knowledge/dev/reports/architecture/rp-post-deploy-final-acceptance-or-operator-standby-2026-06-05/11-post-repoint-proof.md