00 — Readme First
00 — Readme First
RP_POST_DEPLOY_FINAL_ACCEPTANCE_OR_OPERATOR_STANDBY_OOM_WATCH — 20-phase Program Macro, 2026-06-05, EXECUTION mode.
This run started after a context clear; state was rebuilt from MCP checkpoints and live production reads. Old reports were treated as evidence, not authority.
Outcome in one line: deploy has NOT happened, so the macro took the operator-standby branch — it verified the operator-ready state, proved OOM stability from live logs, and advanced the decorated-generated repoint by pre-building a NON-CIRCULAR candidate with a proven parity. All safe engineering is now exhausted; the remaining work is operator (UI deploy, optional repoint apply) and authority (official RP, synthetic-axis registration, REALRUN).
Final verdict: RP_DB_SUPERVISION_READY__OOM_STABLE_NO_NEW_CRASH__NONCIRCULAR_REPOINT_CANDIDATE_PREBUILT__UI_AND_REPOINT_AND_OFFICIALIZATION_OPERATOR_AUTHORITY_GATED. Final status PARTIAL.
Live mutation: birth-free, additive, reversible — one candidate view, one parity function, one parity view. No source-IU edit, no canon, no birth, no event activation, no REAL_RUN, no UI push/deploy, no production current repoint.
The authoritative summary is the checkpoint: checkpoint-rp-post-deploy-final-acceptance-or-operator-standby-2026-06-05.md. SQL, rollback, and the frozen RUNBOOK_v3 live at /opt/incomex/docs/mcp-writes/rp-post-deploy-final-acceptance-or-operator-standby-2026-06-05/. Read docs 01..19 for per-phase detail.