RP Dynamic Drill Grouping — 13 Final Summary
13 — Final Summary
Macro: RP_DYNAMIC_DRILL_GROUPING_UI_PRODUCTION_FIRST_OFFICIAL_AND_ACCEPTANCE_CLOSEOUT
Status: PARTIAL (all safe branches complete; only authority/operator blockers)
Verdict: UI_DYNAMIC_DRILL_PROVEN_WITH_EXPECTED_BLOCKERS
Closed this run (3 chặng together)
- A. Grouping — 10 PXT
NEEDS_GROUPING→ 0. Real per-object children (trigger census / candidates / orphan queue / residual v4). 250 child groups. - B. Substrate — 2 empty candidates classified empty-by-design (0 bugs).
- C/D. Proof + dashboard v2 — 26 cases (22/4/0), dashboard verdict live.
- E/F. UI v2 — 4 pass-through routes + drill patch + smoke payloads (7 paths).
- G/H. Readiness — officialization AUTHORITY_ONLY; deploy READY_OPERATOR.
- I/J. Docs/acceptance — 15 docs + checkpoint, MCP-readable.
Numbers (dual-path verified)
contract 87 nodes/5 axes · substrate 85/87 resolve + 2 empty-by-design · grouping 10→0 · proof 12→26 (22 PASS / 4 EXPECTED_BLOCKER / 0 FAIL) · grouped children 250 · birth-free (1,194,855==) · guard 129.
No-fake (unchanged, live)
official RP 0 · AX-TRIGGER canon 0 · ownership 0 · PROC-OWN votes 0 · REAL_RUN 0 · events 0/7 · real_run_enabled false.
Exact blockers
president PROC-OWN-01..05 (first official job:cut) · AX-TRIGGER owner/canon · AX-PROCESS official RP · REAL_RUN/event flip · UI operator deploy (divergent git). No engineering blocker.
Next macro
AX_PROCESS_FIRST_OFFICIAL_AND_AX_TRIGGER_CANON_AFTER_AUTHORITY
‖ UI_OPERATOR_DEPLOY_V2.