KB-7294
RP Dynamic Drill Grouping — 08 Officialization Readiness
2 min read Revision 1
officializationtrack-gno-fake2026-06-05
08 — Officialization Readiness (Track G)
Live-checked (both paths). No authority landed → nothing executed, nothing faked. UI dynamic-drill proof is independent of officialization.
| Gate | Live value | Status |
|---|---|---|
| official AX-PROCESS RP (axis_assignment) | 0 | BLOCKED — president/owner |
| AX-TRIGGER in axis_registry | 0 | BLOCKED — owner/canon |
| governance_object_ownership | 0 | BLOCKED |
| PROC-OWN votes (apr_approvals) | 0 (5 APR pending PROC-OWN-01..05) | BLOCKED_NO_PRESIDENT_VOTE |
| process_run_observation REAL_RUN | 0 (2 DRY/SIM) | BLOCKED |
| process.* events active | 0 / 7 | BLOCKED |
| dot_config real_run_enabled | false | BLOCKED |
| process candidates (PROCESS_CANDIDATE) | 6 | owner-gated, birth NOT_REQUESTED |
| job:cut | sole verified, READY_FOR_PRESIDENT (PROC-OWN-03) | president-only |
First-official path
PROC:jobcut_verified is the sole first_official_process_ready object. It needs
the president to approve PROC-OWN-03; an agent cannot cast that vote
(fail-closed by fn_apr_block_unimplemented_handler + AI-can-never-be-president).
No guarded execution path exists to run, so none was run.
Conclusion
Officialization status = AUTHORITY_ONLY. Engineering has no blocker. The grouping/substrate closure in this macro does not depend on any of the above — it is pure structure/UI proof.