KB-7294

RP Dynamic Drill Grouping — 08 Officialization Readiness

2 min read Revision 1
officializationtrack-gno-fake2026-06-05

08 — Officialization Readiness (Track G)

Live-checked (both paths). No authority landed → nothing executed, nothing faked. UI dynamic-drill proof is independent of officialization.

Gate Live value Status
official AX-PROCESS RP (axis_assignment) 0 BLOCKED — president/owner
AX-TRIGGER in axis_registry 0 BLOCKED — owner/canon
governance_object_ownership 0 BLOCKED
PROC-OWN votes (apr_approvals) 0 (5 APR pending PROC-OWN-01..05) BLOCKED_NO_PRESIDENT_VOTE
process_run_observation REAL_RUN 0 (2 DRY/SIM) BLOCKED
process.* events active 0 / 7 BLOCKED
dot_config real_run_enabled false BLOCKED
process candidates (PROCESS_CANDIDATE) 6 owner-gated, birth NOT_REQUESTED
job:cut sole verified, READY_FOR_PRESIDENT (PROC-OWN-03) president-only

First-official path

PROC:jobcut_verified is the sole first_official_process_ready object. It needs the president to approve PROC-OWN-03; an agent cannot cast that vote (fail-closed by fn_apr_block_unimplemented_handler + AI-can-never-be-president). No guarded execution path exists to run, so none was run.

Conclusion

Officialization status = AUTHORITY_ONLY. Engineering has no blocker. The grouping/substrate closure in this macro does not depend on any of the above — it is pure structure/UI proof.

Back to Knowledge Hub knowledge/dev/reports/architecture/rp-dynamic-drill-grouping-ui-production-first-official-closeout-2026-06-05/08-officialization-readiness.md