08 — Final Summary
08 — Final Summary
Status: PARTIAL — SUPERTRACK_HARNESSES_LIVE_AWAITING_PRINCIPAL_AUTHORITY
All 5 supertracks complete, applied live, read-back-verified. The completion contract's PASS conditions for the engineering scope are met (harnesses live/apply-ready, operator standby complete, simulator complete, watch dashboard complete, router complete, principal summary complete, checkpoint MCP-readable, no forbidden action). It remains PARTIAL only because owner/president/operator/REALRUN authority has not arrived — which is the defined PARTIAL condition, not a failure.
Delivered (11 live views + 4 docs)
- A: preflight, conditional_execution_harness (10 actions), no_go_guard (13/13).
- B: operator_deploy_execution_harness (4 steps), no_go_guard (5); operator-run-now.md.
- C: side_effect_simulator (7), owner_assignment_simulator (5 live), birth_request_simulator, axis_registration_simulator — all non-mutating.
- D: production_wait_watch_dashboard (12 lanes); WATCH_RUNBOOK.md.
- E: next_macro_router_supertrack (WAIT_WITH_WATCH); Vietnamese principal summary.
The single fact that matters
SELECT recommended_next_macro, reason FROM v_rp_next_macro_router_supertrack; → WAIT_WITH_WATCH. When any human authority lands, this row changes by itself to the correct execution macro and the guarded path runs without rediscovery.
Exact blockers (human-authority only; zero engineering)
- OWNER: no active owner; builder fn
fn_dot_wf_build_candidatesmissing. - PRESIDENT: 0 approve votes on PROC-OWN-01..05.
- OPERATOR: git creds absent; operator_runtime_enabled=false.
- REALRUN: real_run/execute/emit false by design.
Safety
birth before==after 1,210,686; ownership/votes/axis/events/flags all unchanged; no-go 13/13; OOM safe; 15/15 no-fake audit PASS; fully reversible.
Next macro
WAIT_WITH_WATCH → hand off to principal/operator. On authority arrival: router selects RP_GOVERNANCE_AUTHORITY_EXECUTION_AFTER_PRINCIPAL_DECISION / RP_UI_DEPLOY_IF_OPERATOR_READY / RP_REALRUN_AUTHORITY_EXECUTION / RP_FINAL_OPERATING_ACCEPTANCE.