KB-1ABB

RP Dynamic Drill — 13 Final Summary

2 min read Revision 1

13 — Final Summary

Program: Registries-Pivot Dynamic Drill UI / PG Structure Proof — 2026-06-05. Status: PARTIAL (all safe branches complete; only authority/design/operator blockers remain). Verdict: UI_DYNAMIC_DRILL_PROVEN_WITH_CANDIDATE_BLOCKERS.

Delivered

  • Backend (live, birth-free): fn_rp_node_substrate, v_rp_universal_node_ui_contract, v_rp_node_final_substrate_contract, v_rp_dynamic_drill_proof_matrix, v_rp_dynamic_drill_ui_acceptance_dashboard.
  • Proof: Layer1→drill(count>1)→final substrate proven across all 5 axes; 12/12 matrix PASS.
  • UI/API: 7 pass-through routes + generic drill page + 7 render-model components (handoff-final).
  • Docs: 15 reports + checkpoint, MCP-readable.

Numbers

  • Universal contract: 87 nodes (39 base / 22 process / 12 pxt / 7 topic / 7 trigger); 85 substrate; 30 drillable.
  • Births 1,194,828 before == after (zero engineering mutation).
  • Dual-path identical; no drift.

Blockers (exact)

  1. President PROC-OWN vote → first official AX-PROCESS (job:cut READY_FOR_PRESIDENT).
  2. Owner birth/ownership for WPC candidates + AX-TRIGGER classes.
  3. Cross-axis grouping rule for 10 Process×Trigger gaps (design).
  4. Operator UI push/deploy (main cron-owned, feat divergent).
  5. REAL_RUN flip / event activation (owner).

Next macro

AX_PROCESS_TRIGGER_GROUPING_RULE_AND_UI_DEPLOY_AND_FIRST_OFFICIAL_PROCESS.

Back to Knowledge Hub knowledge/dev/reports/architecture/registries-pivot-dynamic-drill-ui-pg-structure-proof-2026-06-05/13-final-summary.md