KB-1ABB
RP Dynamic Drill — 13 Final Summary
2 min read Revision 1
13 — Final Summary
Program: Registries-Pivot Dynamic Drill UI / PG Structure Proof — 2026-06-05.
Status: PARTIAL (all safe branches complete; only authority/design/operator blockers remain).
Verdict: UI_DYNAMIC_DRILL_PROVEN_WITH_CANDIDATE_BLOCKERS.
Delivered
- Backend (live, birth-free):
fn_rp_node_substrate,v_rp_universal_node_ui_contract,v_rp_node_final_substrate_contract,v_rp_dynamic_drill_proof_matrix,v_rp_dynamic_drill_ui_acceptance_dashboard. - Proof: Layer1→drill(count>1)→final substrate proven across all 5 axes; 12/12 matrix PASS.
- UI/API: 7 pass-through routes + generic drill page + 7 render-model components (handoff-final).
- Docs: 15 reports + checkpoint, MCP-readable.
Numbers
- Universal contract: 87 nodes (39 base / 22 process / 12 pxt / 7 topic / 7 trigger); 85 substrate; 30 drillable.
- Births 1,194,828 before == after (zero engineering mutation).
- Dual-path identical; no drift.
Blockers (exact)
- President PROC-OWN vote → first official AX-PROCESS (job:cut READY_FOR_PRESIDENT).
- Owner birth/ownership for WPC candidates + AX-TRIGGER classes.
- Cross-axis grouping rule for 10 Process×Trigger gaps (design).
- Operator UI push/deploy (main cron-owned, feat divergent).
- REAL_RUN flip / event activation (owner).
Next macro
AX_PROCESS_TRIGGER_GROUPING_RULE_AND_UI_DEPLOY_AND_FIRST_OFFICIAL_PROCESS.