KB-2A6E

RP Dynamic Drill UI PG Structure Proof — 00 README First

3 min read Revision 1

Registries-Pivot Dynamic Drill — UI/PG Structure Proof (2026-06-05)

Macro: REGISTRIES_PIVOT_DYNAMIC_DRILL_UI_PG_STRUCTURE_PROOF_AND_OPERATIONAL_CLOSEOUT Mode: EXECUTION · Live mutation: YES (additive/birth-free DB views+fn; NO data/canon/git-push mutation) Final verdict: UI_DYNAMIC_DRILL_PROVEN_WITH_CANDIDATE_BLOCKERS

What was proven

Registries-Pivot can render the real PG structure from Layer 1 → drill (while count>1) → final substrate across all 5 axes (AX-BASE, AX-TOPIC, AX-PROCESS, AX-TRIGGER, Process×Trigger), with a single universal contract and NO Nuxt-side business math.

Built (live, birth-free — births 1,194,828 before == after across 3 applies)

  1. fn_rp_node_substrate(axis_code, node_code) → jsonb — universal final-substrate dispatcher (all axes).
  2. v_rp_universal_node_ui_contract — one UI contract row per node (87 nodes), every axis.
  3. v_rp_node_final_substrate_contract — substrate metadata per node (exercises the dispatcher).
  4. v_rp_dynamic_drill_proof_matrix — 12 cases, verdict computed LIVE → 12/12 PASS.
  5. v_rp_dynamic_drill_ui_acceptance_dashboard — single-row operational verdict.

UI/API (handoff-final, build-ready, operator-gated deploy)

7 pass-through API routes + generic drill.vue + 7 render-model components, staged at /opt/incomex/docs/mcp-writes/rp-dynamic-drill-2026-06-05/ui-package/.

Honest gaps (shown, not hidden)

  • 2 empty AX-PROCESS candidates (WPC-MONITOR-BOOTSTRAP, WPC-UNCLASSIFIED, member_count=0) → no substrate.
  • 10 Process×Trigger gaps with object_count>1 → NEEDS_GROUPING (cross-axis grouping rule pending).
  • Authority still blocked: official AX-PROCESS RP 0/453, PROC-OWN 0 votes, REAL_RUN 0 — shown as CANDIDATE/BLOCKED_AUTHORITY, never faked.

Doc index

01 dual-path verification · 02 universal UI contract · 03 final substrate contract · 04 proof matrix · 05 UI/API route package · 06 render model · 07 backend gap closure · 08 UI branch/build PR strategy · 09 acceptance dashboard · 10 content/operator docs · 11 final acceptance verdict · 12 safety/no-fake audit · 13 final summary · 14 MCP-readable checkpoint.

SQL: /opt/incomex/docs/mcp-writes/rp-dynamic-drill-2026-06-05/{01_apply,02_patch_base_substrate,99_rollback}.sql

Back to Knowledge Hub knowledge/dev/reports/architecture/registries-pivot-dynamic-drill-ui-pg-structure-proof-2026-06-05/00-readme-first.md