KB-5D19
PD Full Operationalization — 11 Next Macro Decision
2 min read Revision 1
11 — Next Macro Decision
Decision rule applied
"If endpoint deployed and dry-run succeeds → choose owner/event/process split + UI/canon." Endpoint is deployed and the first true DRY_RUN succeeded. Engineering blockers on the process chapter are cleared; what remains is owner/governance drain.
PRIMARY next macro: PROCESS_AXIS_OWNER_DRAIN_AND_CANON (Macro 1, doc 09)
Assign owners (AX-PROCESS / job:cut / dot:kg), canon PIV-340..353, birth job:cut, split dot:kg into 10 process defs, activate process.* events — all owner-gated; Claude pre-stages packets + rehearsed birth-free SQL.
PARALLEL (start now, no owner needed):
- INFORMATION_PIECE_CONTENT_WORK_RESUME_ON_TOPIC_PROCESS_SURFACES (Macro 3) — content is unblocked (doc 08).
- DOT_KG_CORRELATED_DRYRUN_AND_REAL_RUN_LADDER (Macro 2, dry-run-pair half only; real run owner-gated).
- Operator: deploy the v8 UI/API package; promote the executor from
docker runto the compose service block (service-snippet.txt) for restart-durability.
Not chosen (and why)
- "endpoint deploy" / "UI only" micro-macros — already done.
- content-only as primary — process owner-drain is the higher-leverage closeout; content runs in parallel.