KB-177C

09 — Process Axis Closeout Roadmap

3 min read Revision 1

09 — Process Axis Closeout Roadmap (Workstream H)

One decision-grade roadmap to finish the Registries-Pivot Process Axis and return to information-piece content work. No small task loops.

What is DONE / LIVE

  • Process Discovery substrate v2→v6 + this run's v7 closeout views (LIVE).
  • Runtime observation tables; fail-closed dispatcher; agent_api contract registry (LIVE).
  • Deterministic verifier — proven both directions (pass + negatives) after this run's fix (LIVE).
  • Endpoint producer service — authored, staged, wiring-self-tested (STAGED).
  • Auto-workflow admission policy — operationalized over live views (LIVE).
  • D1/D2 companion content set — published.
  • job:cut — verified_candidate, registration packet final.
  • dot:kg — plan_only_tested, full post-endpoint packet (owner/event/10-def split) final.

What REMAINS

# step gate type blocker
1 Deploy endpoint container + bind operator + owner owner authorizes OpenAI credential reuse; operator deploys
2 First true DRY_RUN (one KG pair) operator step 1
3 UI v6/v7 deploy operator none (ready)
4 job:cut owner registration + birth owner owner-of-record (Điều 37)
5 dot:kg correlation + real run engineering + operator step 2; establish shared process_run_id
6 dot:kg owner + 10-def split + birth owner step 5
7 process pivots canonization (PIV-*) owner births canon
8 process.* event activation owner production-affecting; deliberate
9 return to information-piece content work none

What can proceed WITHOUT owner (operator/engineering only)

  • UI v6/v7 deploy (step 3) — fully ready now.
  • Endpoint container build + internal deploy + self-test (the no-credential parts of step 1).
  • dot:kg correlation modeling design (pre-work for step 5).

What requires OWNER

  • Credential reuse authorization (step 1), job:cut + dot:kg birth (4, 6), pivot canon (7), event activation (8), verifier re-classification decision (doc 06).

What requires EXTERNAL infra

  • Only the OpenAI credential authorization for the new executor (everything else — SDK, egress, hosting — is present). This is the single remaining true external dependency, and it is narrow.

Exact order to finish

  1. UI v6/v7 deploy (parallel, no blockers).
  2. Owner authorizes credential reuse → operator deploys endpoint → bind.
  3. First true DRY_RUN (one KG pair).
  4. job:cut owner registration + birth.
  5. dot:kg correlation → real run → owner → 10-def split → (optional) event activation.
  6. Process pivots canonization.
  7. Return to information-piece content work.

Anti-pattern guard

Do NOT re-run discovery/readiness loops. The substrate is complete; remaining work is deploy + owner decisions + content. The next macro should pick the largest safe block (see doc 11), not a narrow approval-only step.

Back to Knowledge Hub knowledge/dev/reports/architecture/process-discovery-endpoint-service-ui-registration-content-policy-closeout-2026-06-04/09-process-axis-closeout-roadmap.md