KB-5D71

F6 Pre-Activation Macro 09 — Final GO/NO-GO & Next Macro

3 min read Revision 1
one-roofphase1f6go-nogonext-macroratification2026-06-02

09 — Final GO / NO-GO & Next Macro

Outcome

PASS — pre-activation coverage advanced as far as is safe in one macro. Full-scale ownership coverage proven (210→0), scanner read-path concrete and tested, issue/event boundary shaped, axis/object-grain and persistence boundaries held at their gates. Zero persistent mutation. ospa still 0. Activation NO-GO.

Decision matrix

Next step Decision Condition
Further rollback-only coverage rehearsals GO (low value remaining) full-scale already proven; only edge variants left
GPT review of this macro GO parallel, read-only
Human B-RATIFY (L2 quorum + L4 e-sign of auth model) GO (human-only) the sole unblock for persistence
F-6 ownership-seed COMMIT (TEST_MODE) NO-GO needs L2+L4 and ospa ≥ 1 (live 0); artifact already proven (doc 04)
governance_ruleset / candidate / scan_run / cursor persistence NO-GO ratify-gated (doc 07)
Scanner write-half / worker / backfill NO-GO activation-gated
Event emit / issue persist / handler / DOT / UI NO-GO activation-gated / forbidden (system_issues=9 triggers)
Axis-grain coverage NO-GO axis_*/coverage_rule absent — future design
Object-grain scan NO-GO ~6.5 M cells, unbounded, no coverage_rule

Activation

NO-GO. Unchanged. L2+L4 ratification DEFERRED, not solved.

Remaining blockers (the only real ones)

  1. L2 quorum approval of the auth model (human).
  2. L4 President e-signature (human, out-of-band in Directus).
  3. os_proposal_approvals ≥ 1 (live 0) — machine-checkable evidence of #1/#2.

Until all three clear, every persistence/activation step stays NO-GO. No further engineering is required to reach the first persistent commit — the committable artifact (30 group anchors) is proven; only ratification is missing.

ONE_ROOF_PHASE1_COVERAGE_F6_COMMIT_ON_RATIFICATION — a guarded macro that:

  1. re-runs Hard Gate 0;
  2. checks os_proposal_approvals ≥ 1 as a hard precondition (aborts if 0);
  3. if satisfied, commits the proven 30-anchor owner seed (rollback pre-staged), re-asserts gap=0/conflict=0 pre-COMMIT;
  4. verifies no event/issue/worker side effect post-COMMIT.

Run in parallel with human B-RATIFY (the actual gate) and GPT review of this macro. Absent ratification, the highest-value remaining work is non-engineering: the human L2/L4 act.

Back to Knowledge Hub knowledge/dev/reports/architecture/one-roof-phase1-coverage-preactivation-consolidated-testmode-macro-2026-06-02/09-final-go-nogo-and-next-macro.md