KB-392F

87 — Final Pre-Code Readiness Matrix (2026-06-01)

6 min read Revision 1
one-roof-governanceimplementation-indexreadiness-matrixfinal-pre-codebuild-ready-needs-authbuild-no-go2026-06-01

87 — Final Pre-Code Readiness Matrix

Branch E (mission §8). Tier: status roll-up. Mutation footprint: ZERO. Status legend: DESIGN_COMPLETE (technical design done, not rehearsed) · REHEARSED_GREEN (live BEGIN..ROLLBACK passed, entry==exit) · BUILD_READY_NEEDS_AUTH (engineering ready; only sovereign/council authorization + fold-ins remain) · BUILD_NO_GO (cannot build now) · FUTURE_LAW_OR_DESIGN (needs new law/design first) · DEFERRED (intentionally postponed). Master gate: M-1 os_proposal_approvals = 0 (live 2026-06-01) ⇒ COMMIT_FORBIDDEN for every row below. "Build-ready" never means "build now"; it means "engineering-proven, awaiting authorization."


87.1 Component readiness

Component Design Rehearsal Net status Blocking authority Mandatory fold-ins
SB-1 APR action-types (vocabulary, Phase A) COMPLETE (16) REHEARSED_GREEN (83/84) BUILD_READY_NEEDS_AUTH M-1 + C-2 build record F-83-1 (birth trigger), action≠'add' convention
SB-1 Phase-B handler (apply) COMPLETE (16 §2) n/a BUILD_NO_GO A-9 H-1/H-2/SB-6 sovereign + C-2 G-APPLY do-not-build
SB-2 owner/ownership substrate COMPLETE (17) REHEARSED_GREEN (75–81) BUILD_READY_NEEDS_AUTH M-1 + C-1 build record additive-table (no CHECK-widen); trigger-less
SB-10 candidate-state store (keystone) COMPLETE (40) REHEARSED_GREEN (60/62) BUILD_READY_NEEDS_AUTH M-1; needs SB-12+SB-13 first (FK) L-CANON-NULL candidate_key
SB-11 governance event domain COMPLETE (41) REHEARSED_GREEN (61/62) BUILD_READY_NEEDS_AUTH M-1; A-3 (C-7.1) for trust activation F-57-2/3/4; active=false
SB-12 ruleset/snapshot COMPLETE (38) REHEARSED_GREEN (58/62) BUILD_READY_NEEDS_AUTH M-1; A-4 (C-7.2) before activation
SB-13 worker cursor COMPLETE (39) REHEARSED_GREEN (59/62) BUILD_READY_NEEDS_AUTH M-1 F-57-1; L-WATERMARK text
T6 coverage scanner DOTs COMPLETE (25) REHEARSED_GREEN (Part A, 63) BUILD_NO_GO (until SB-10..13 built) M-1; SB-10..13 built; C-7 F-R7-1/2; doc 25 surgical patch
T7 issue/event/notification COMPLETE (24) REHEARSED_GREEN (register step, 61) BUILD_NO_GO (until SB-11 built) M-1; SB-11 built F-57-2/3/4; doc 24 surgical patch
GCOS backfill (seed) COMPLETE (31) substrate-rehearsed BUILD_NO_GO M-1; C-7.3 backfill-ruleset; SB-10..13 dry-run first
GCOS handoff (Birth→governance) COMPLETE (32) substrate-rehearsed BUILD_NO_GO M-1; C-7.5 observer-trigger (Option A needs none) Birth untouched (Option A)
GCOS input gate (L0) COMPLETE (33) substrate-rehearsed BUILD_NO_GO M-1; C-7.1 input-trust bad input→quality issue, never gov-orphan
GCOS candidate scan (dirty-group) COMPLETE (34) REHEARSED_GREEN (SB-10, 60) BUILD_NO_GO M-1; SB-10..13 built no checked-forever boolean
OP-B IU owner (GOV-IU / owner binding) concept-deferred (26) n/a FUTURE_LAW_OR_DESIGN C-3/C-4 + IU technical design unblocks T5/T10, SB-3
SB-3 IU axis envelope (4th axis as data) concept-deferred n/a FUTURE_LAW_OR_DESIGN after OP-B; Axis Registry design assign_axis_owner works without it
C-5 GOV-MOUT / display delegation design (16 §4.3, delegate_authority) rehearsed as action-type (83) BUILD_NO_GO M-1; C-2; SB-2 built delegation requires TTL
H-1 / H-2 sovereign approval path external (governance) n/a BUILD_NO_GO (sovereign-only) President — the only M-1/A-1/A-2 satisfier os_proposal_approvals write
L-1 / L-2 law cleanup / enactment design n/a FUTURE_LAW_OR_DESIGN council/sovereign enactment normative_registry lacks Đ20/23/44/45 rows

87.2 Roll-up counts

  • REHEARSED_GREEN (engineering proven): SB-1 vocab, SB-2, SB-10, SB-11, SB-12, SB-13, T6 Part-A rows, T7 register step, GCOS candidate scan — 9 lines.
  • BUILD_READY_NEEDS_AUTH (only authorization + fold-ins remain): SB-1 vocab, SB-2, SB-10, SB-11, SB-12, SB-13 — 6 components.
  • BUILD_NO_GO (engineering gated on other builds / sovereign): SB-1 Phase-B, T6, T7, GCOS backfill/handoff/input/candidate, C-5, H-1/H-2 — 9 lines.
  • FUTURE_LAW_OR_DESIGN: OP-B, SB-3, L-1/L-2 — 4 lines.
  • DEFERRED: none outstanding that block the SB-1/SB-2/GCOS owner-and-substrate spine.

87.3 Matrix verdict

The owner/APR/substrate spine is engineering-complete and rehearsed-green. Six components are BUILD_READY_NEEDS_AUTH. Nothing is BUILD_READY_NOW — every line is gated by the sovereign master gate M-1 (os_proposal_approvals=0) and, for the council-scoped lines, by formal C-1/C-2/C-7 build-intake records (silence ≠ approval). The path to first build is authorization, not more engineering — plus the mandatory fold-ins (doc 86). See doc 88 for the per-blocker ledger and doc 89 for the build handoff.

Back to Knowledge Hub knowledge/dev/reports/architecture/one-roof-governance-technical-addendum-and-implementation-index-2026-06-01/87-final-pre-code-readiness-matrix.md