KB-2D69

122 — Phase 1 Full Post-Build Verification — NO BUILD; substrate untouched (2026-06-01)

2 min read Revision 1
one-roof-governanceimplementation-indexphase1post-build-verificationzero-mutationentry-equals-exit2026-06-01

122 — Phase 1 Full Post-Build Verification

Status: no build occurred. This doc records the full live read-only verification proving the substrate is exactly as it was — entry == exit at the mission level (not just per-transaction), because no transaction was ever opened against the substrate.

122.1 Verification battery (doc 89 §89.4, run read-only this session 2026-06-01)

surface value expected baseline
M-1 os_proposal_approvals 0 0
SB-2 governance_object_ownership / governance_responsibility_scope ABSENT / ABSENT absent
SB-12 governance_ruleset ABSENT absent
SB-13 gov_worker_cursor ABSENT absent
SB-10 governance_candidate_state / candidate_scan_run ABSENT / ABSENT absent
apr_action_types total / SB-1 new / birth-apr 6 / 0 / 0 6 / 0 / 0
approval_requests / apr_approvals 211 / 42 211 / 42
event_type_registry gov / event_outbox gov 0 / 0 0 / 0
dot_domains / dot_tools / dot_coverage_required 46 / 309 / 11 46 / 309 / 11
normative_registry / law_catalog 47 / 5 47 / 5
idle in transaction (directus) 0 0

122.2 Out-of-scope mutation checks (all must be ZERO — all are)

  • Event emit: 0 (event_outbox governance = 0).
  • DOT registration: 0 (dot_tools = 309, unchanged; no GCOS DOTs added).
  • Directus / Qdrant / Nuxt mutation: none (no write tool invoked against any of them).
  • Law enactment / version / status bump: none (normative_registry 47, law_catalog 5 unchanged).
  • Auto-approve bypass: none (approval_requests unchanged; no INSERT/UPDATE attempted).

122.3 Verdict

Full verification PASS for a no-build run. Every governance-scoped surface equals its baseline. The only writes this mission performed were KB report docs (114–125). The DB substrate carries zero mutation.

Back to Knowledge Hub knowledge/dev/reports/architecture/one-roof-governance-technical-addendum-and-implementation-index-2026-06-01/122-phase1-full-post-build-verification.md