Status: NOT_RUN. Hard Gate B (build preflight) is only reached after Phase A passes. Phase A is BLOCKED (docs 114/115): M-1 = 0, no approval/intake record created. Therefore Hard Gate B was not entered and no build preflight for a COMMIT was performed.

116.1 Gate B checklist — state at this run

Gate B item (mission §4) Required Actual Pass?
1. Re-run doc 96 preflight green baseline matches doc 96 exactly (doc 114 §114.8) n/a — not a build trigger
2. M-1 green for the specific step green RED (os_proposal_approvals = 0) FAIL → STOP
3. Council C-1/C-2/C-7 satisfied for current step recorded not present FAIL
4. Backup/rollback artifacts staged staged not staged (no build) n/a
5. Target objects state absent/expected all 6 SB targets ABSENT (expected) ok
6. Stop conditions clear clear stop condition M-1=0 is ACTIVE FAIL → STOP

116.2 Verdict

Gate B item 2 (M-1) and item 6 (active stop condition) fail. STOP. No build preflight-to-COMMIT performed. The read-only baseline is recorded in doc 114 §114.8 as evidence the substrate is untouched.