KB-6CD5

112 — Phase 1 Build Final Readiness for Next Stage (BLOCKED; needs sovereign M-1 + C-1/C-2, 2026-06-01)

4 min read Revision 1
one-roof-governanceimplementation-indexphase1readiness-next-stageblockedsovereignm-1c-1c-2authorization-gapno-mutation2026-06-01

112 — Phase 1 Build: Final Readiness for Next Stage

Overall: BLOCKED. Engineering readiness is complete; the only remaining blocker is authorization, and it is the kind only the human sovereign (plus council) can supply. No engineering work remains before the first COMMIT.

112.1 What is ready (GREEN)

  • All Phase-1 substrate designs complete and GPT-reviewed (docs 38–41, 16–17, 76–79, 98).
  • All rehearsals executed live BEGIN..ROLLBACK with entry==exit (docs 57–92), including SB-1 which surfaced and validated the F-83-1 fix.
  • Safety pack complete: scope/risk (93), stepwise plan (94), per-step auth forms + NO-GO form (95), preflight (96), rollback/disaster (97), F-83-1 requirement (98), SQL-pack spec (99), GO/NO-GO matrix (100), post-build verify (101).
  • Live preflight clean and pristine greenfield (doc 104).

112.2 What is missing (the real blocker) — authorization, recorded as data

The build agent reached Hard Gate 0 and STOPPED because the master gate is shut. Three non-interchangeable authorities are required, and the recorded ones are sovereign/council acts — not something a GPT ruling or the build agent can substitute:

Authority What it is How it is recorded Live status
M-1 sovereign the ONLY COMMIT key, per step a sovereign-created row in os_proposal_approvals scoping to the step ABSENT — count = 0
C-1 council SB-2 build intake recorded council decision ABSENT
C-2 council SB-1 build intake recorded council decision ABSENT
GPT delegated ruling rehearsal-class technical review the cited GPT doc present, but cannot satisfy M-1 (docs 68/80/89)

Key point for the sovereign: the GPT "delegated build authorization" doc, by the governance model you defined, is not the commit key. The commit key is a row you (the sovereign) cause to be written into os_proposal_approvals, per step, through the proper approval flow — never prose, never self-approval by the agent. Until that row exists for a step, that step is COMMIT_FORBIDDEN.

112.3 Exact path to unblock (in order)

  1. Council C-1 + C-2 build-intake records created and stored (doc 95 per-step authorization forms; doc 46 C-7 packet context).
  2. Sovereign M-1 write: a real os_proposal_approvals row (or one per step) created via the governed approval flow, scoping to the authorized Phase-1 step(s). This is the act that flips a doc-100 row from "eligible" to "GO-NOW".
  3. Optionally fold in doc-86 corrections at build time (already enumerated).
  4. Re-run doc 96 preflight immediately before each step; proceed step-by-step in the authorized order SB-12 → SB-13 → SB-10 → SB-11 → SB-2 → SB-1 (SB-1 last; F-83-1 first within SB-1).

112.4 Next macro

  • P1 (real blocker): sovereign + council authorization intake (record C-1/C-2; write sovereign os_proposal_approvals per step). This is the only thing standing between the project and the gated build.
  • P2 (parallel, optional): GPT review of docs 104–113 (this BLOCKED build-entry pack).
  • P3 (after P1): re-invoke the gated Phase-1 build; STEP 0 preflight will then find M-1 satisfied for the step and proceed.

Final readiness verdict: BLOCKED on authorization (M-1 sovereign + C-1/C-2 council). Zero engineering work remains. Zero mutation performed.

Back to Knowledge Hub knowledge/dev/reports/architecture/one-roof-governance-technical-addendum-and-implementation-index-2026-06-01/112-phase1-build-final-readiness-for-next-stage.md