08 — Next Prompts (paste-ready follow-on macros)
08 — Next Prompts (paste-ready follow-on macros)
Package:
one-roof-auth-axis-bootstrap-ratification-rehearsal-go-nogo-2026-06-02All macros are self-contained-after-clear (cite KB paths + live-verify first). Build stays NO-GO until B-RATIFY is enacted.
P1 — GPT artifact re-verification (immediate, gating)
Route this published package to the GPT council for artifact re-verification (mission §5). Confirm
list_documents/get_document/search_knowledgenow return docs 00–09 and that hardening 00/14 + impl-index 89 carry the back-cross-links (rev 2). Only after GPT confirms readability does ratification decision-intake (P2) proceed. Read first: this package 00, 06, 07, 09; the verification report; the GPT rerun-required review. Forbidden: any build/COMMIT.
P2 — Authorization-model ratification decision-intake (CRITICAL PATH, the one gate)
Prepare the L2 council + L4 sovereign ratification packet to adopt the auth model (redefine M-1 → per-step
governance_build_authorization; adopt SB-0). DECISION-ONLY, no build. (This is hardening doc 14 N1, now unblocked by the verified rehearsal.) Read first: hardening docs 02, 03, 11, 12 (P1/P2/P3), 13; this package 01, 03; impl-index 89. Produce: the exactapproval_requeststext forauthorize_build_step(action='review',titleset); the council L2 decision record template; the sovereign L4 e-sign scope wording (one-time constitutional adoption); the bootstrap explanation (doc 02 §2.7). Forbidden: writing anyos_proposal_approvals/approval/grant row — this is the packet, not the act.
P3 — Gated SB-0 build (ONLY after B-RATIFY enacted)
After the L2 council record + L4 sovereign
os_proposal_approvalsrow for SB-0 exist, build SB-0 in one small reviewed transaction:governance_build_authorization+ indexes +v_build_auth_valid+quorum_passed/valid_sovereign_esign+fn_build_commit_allowed; then the 8apr_action_typesrows in the SB-1 txn with the F-83-1 re-wire first. Rehearse BEGIN..ROLLBACK (this package's script) immediately before COMMIT; pg_dump touched reuse-tables; verify entry==exit + idle-tx=0 after. Read first: hardening doc 03; this package 03, 05; impl-index 89 (stop conditions), 90, 91. Gate: STOP unlessos_proposal_approvalshas a row for THIS step.
P4 — GPT review of this hardening package (parallel, independent)
hardening doc 14 N3 — review hardening docs 00–16 for build-readiness sufficiency before Phase-0 ratification. Runs in parallel with P1/P2.
P5 — Axis substrate build (downstream of SB-0)
hardening doc 14 N5 close + build
axis_registry+axis_assignmentunder an SB-0 L3 grant; decide FAC-08 cardinality/max_labels_per_entity. Only after SB-0 built.
P6 — fn_auto_approve_add hardening (P5, standalone-reversible)
hardening doc 14 N4 — auto-approve iff
proposed_action_code ∈ governed allowlist AND risk='low', else fail-safe deny. Rehearse BEGIN..ROLLBACK; may land first if sovereign-approved as a safety patch.
Sequencing
P1 (GPT artifact re-verify) → P2 (ratification intake, the one gate) ∥ P4 (hardening review)
│ (after L2+L4 enacted)
▼
P3 (gated SB-0 build) → P5 (axis build)
P6 (auto-approve fix) may land first, standalone, reversible.
Build is NO-GO until P2's ratification is enacted by human/sovereign. No agent step crosses that line.
Addendum — P2 ratification-intake EXECUTED & PUBLISHED (2026-06-02)
Forward cross-link added by the PUBLISH_VERIFY_AND_CLOSE mission. Body above is unchanged.
P2 (authorization-model ratification decision-intake) has been executed and its package published + verified in KB:
knowledge/dev/reports/architecture/one-roof-auth-model-ratification-intake-2026-06-02/ (docs 00–07).
- Verdict (D-PATH): the ratification is NOT Agent-recordable — no live surface can hold it as an Agent-authored governed act (enactment = forgery; intake-request blocked by no governance action-type + constitutional origination + no-mutation scope). See intake doc 03.
- Deliverable: a human/sovereign ratification-ready packet with exact UI/manual steps —
request
APR-BOOT-AUTHMODEL-1(use a non-addaction so it stays on the L2 council path; blankproposed_action_code), L2 council template, L4 President e-sign wording. See intake doc 04. - Build: remains NO-GO; status GO_TO_RATIFICATION_INTAKE sustained. The one gate B-RATIFY is human L2 + L4 only.
- Next: route the packet to the council + President (intake doc 06 P2-EXEC → H-RATIFY), then P3 gated SB-0 build only after L2+L4 are enacted.
See [[one-roof-auth-model-ratification-intake-2026-06-02]].