KB-1A84
Branch F — Updated IU Technical Gap Board (2026-05-29)
3 min read Revision 1
iugap-boardbranch-fstatus2026-05-29
Branch F — Updated IU Technical Gap Board
Doc 06 (2026-05-29)
A. Fixed now (this session)
| Item | Fix | Reversible |
|---|---|---|
| P0 post-cut axis-B autowire | fn_cut_complete wires fn_iu_post_cut_axis_materialize(source_ref,actor), gated/best-effort/idempotent (default off) |
✅ restore original def |
| Reconstruct not DOT-wrapped | dot_iu_reconstruct_source registered (read-only) |
✅ DELETE row |
| Vector PG↔Qdrant drift (was YELLOW) | Read-only reconcile: Qdrant 149 == PG 149; "0 points" note was stale | n/a (read-only) |
B. Still a TECHNICAL gap (agent-solvable; specified, not yet executed)
| Item | Status | Next |
|---|---|---|
| 7 mutating DOT wrappers (emit, route-worker, dlq-replay, relation-assert, enact, capture-status, vector-reindex/verify) | Packs ready (Doc 02 §3) | Macro M2: author Tier-B + paired Tier-A under APR |
Đ35 / dot_tools integration of IU catalog |
Plan ready (Doc 03) | Macro: APR ratify sub-registry + fn_dot_iu_tools_reconcile |
iu_qdrant_collection_registry.notes stale ("0 points") |
cosmetic | one-line PG update in a safe write window |
dot_iu_vector_verify Tier-A (PG↔Qdrant GET-compare → system_issues) |
specified | with M2 |
Activate post-cut autowire (open three_axis_auto_refresh_enabled) |
mechanism ready | governance decision (pilot may keep off) |
C. Design / human-decision gap (NOT agent-solvable)
| Item | Owner |
|---|---|
Whether to enable three_axis_auto_refresh_enabled in pilot |
governance |
| P-pub warn→block + production review_decision authoring | Council / Đ32/38/39 |
| Human-org-role / permission law (D-1) | future Điều XX |
| Candidate / Tier / Governance-Ops surveys + IU-substrate Gate A | governance |
D. Deferred workflow / MOWD discussion (out of scope here)
| Item | Disposition |
|---|---|
Workflow substrate IU-binding (inline bpmn_xml/narrative/trigger_*_text) |
Deferred — design topic |
| MOW vs MOWD (recommendation: Hybrid, no 5th Mother) | Deferred — see prior audit Doc 05 |
| Workflow design blueprint schema | Deferred — see prior audit Doc 06 |
| Read-only workflow UI proof surface | Deferred — needs human-org-role law |
Recorded for later human discussion per user direction: all of Section D plus C-items remain open business/design questions; this campaign touched none of them.
E. IU technical-readiness statement
Post-session, IU core is technically clean for the pilot: P0 fixed (mechanism wired, default-off), reconstruct auditable, vector reconciled GREEN, regression pilot-green, gates closed, never-flip intact. Remaining technical work is additive DOT coverage + Đ35 integration (specified, governed), not defects.