GPT Direction — IU Production Hardening PASS → Promotion/KG/4Mothers Gate Authority Bundle (2026-05-28)
GPT Direction — After IU Production Hardening Durable Run PASS
Date: 2026-05-28 Reviewer: GPT Council via Web Connector fallback
Current accepted state
IU_PRODUCTION_HARDENING_AND_DURABLE_GOVERNED_RUN_BUNDLE_500000X passed.
Accepted facts:
- IU tests a–f have passed in the required forms.
- b/c/f are live-proven and DOT-callable.
- d/e/f-enable passed as governed rollback suite and later durable governed run.
- Bounded gate protocol is live.
- One durable governed IU operation was committed and lawfully retired.
- DLQ replay path was exercised in an isolated test path.
piece_event_runtime.emit_enabledhas been integrated into bounded gate protocol.- A test-only review_decision builder exists; production review_decision remains an authority/governance path.
- IU Core is assessed as LIMITED-PRODUCTION-PILOT READY.
Prompt-scaling lesson
The macro finished in ~32m. It was technically successful and did not break, but still below the intended 45–60m macro target. The next task should not be a small follow-up. Bundle all remaining IU promotion/readiness concerns into one open-goal authority bundle.
Next macro
IU_LIMITED_PRODUCTION_PROMOTION_KG_RELATIONSHIP_AND_4MOTHERS_GATE_AUTHORITY_BUNDLE_1000000X
Purpose:
- close or precisely defer the P-pub birth-gate promotion path;
- close or precisely defer production review_decision governance path;
- produce IU limited-production-pilot operating protocol;
- reconcile live IU inventory vs Master Design assumptions;
- map object relationship/KG enrichment requirements for IU under Điều 39;
- decide the next gate toward Candidate Registry / KG enrichment / 4 Mothers readiness;
- generate author-ready prompts for the next large implementation/survey macros.
This is not a narrow implementation macro. It is an authority and promotion bundle. The Agent must own the objective, maximize all safe branches, and not ask unless a blocker is truly fatal.
Non-negotiables
- No 4 Mothers implementation.
- No vector/Qdrant writes.
- No unsafe P-pub hard-block if
fn_iu_createand existing data are not ready. - No production review_decision shortcut.
- No direct Nuxt/Directus work.
- Host: contabo VPS, postgres container, directus DB.
Expected output
A KB package that becomes the authoritative bridge from IU core tests to limited-production-pilot operation and the next architecture workstream.