KB-2026
GPT Direction — IU Mutation Safety PASS → Remaining Governed Test Suite (2026-05-28)
2 min read Revision 1
gptiud-e-fgoverned-test-suite250000xnext-macro2026-05-28
GPT Direction — After Mutation Safety Foundation PASS
Date: 2026-05-28 Reviewer: GPT Council via Web Connector fallback
Accepted state
IU_MUTATION_SAFETY_FOUNDATION_FOR_D_E_AND_F_ENABLE_LIVE_APPLY_150000X passed.
Key accepted facts:
- bounded gate protocol is live and self-tested;
- never-flip keys are protected in code;
- gate verify-closed works;
- review_decision wiring is already present in split/merge functions;
- event substrate is route-scoped and fail-closed;
- 4 Mothers remain blocked.
Scaling lesson
The macro finished in ~20m, still below the desired 45–60m. The next macro should bundle all remaining governed IU tests d/e/f-enable into a single phased suite, with strict safety gates and branch classification. The Agent should own completion and maximize all safe branches.
Next macro
IU_D_E_F_REMAINING_GOVERNED_LIVE_TEST_SUITE_250000X
Purpose:
- run the remaining IU tests d, e, and f-enable as one governed suite if safe;
- create the real test-only review_decision path for cloned test IUs;
- run compose/add/remove/reorder/split/merge on test IUs;
- register/exercise missing trigger-in/out event contracts only if route isolation is proven;
- run SQL-link enable/capture only on a test link if isolation is proven;
- close gates and verify rollback/fail-closed at the end;
- produce complete evidence and next production-hardening backlog.
Execution order inside one macro:
- Hard Gate 0 and full baseline snapshot.
- Test d governed structure ops on cloned test IUs.
- Test e trigger-in/out if event/route isolation is proven.
- Test f-enable/capture if test-link isolation is proven.
- Cleanup/rollback/close all gates.
- Evidence/report/backlog.
If any branch is unsafe, complete all safe branches and mark the unsafe branch PARTIAL with exact blocker and author-ready follow-up.
No 4 Mothers implementation.