GPT Direction — IU d/e/f PASS → Production Hardening Bundle (2026-05-28)
GPT Direction — After IU d/e/f Governed Suite PASS
Date: 2026-05-28 Reviewer: GPT Council via Web Connector fallback
Accepted state
IU_D_E_F_REMAINING_GOVERNED_LIVE_TEST_SUITE_250000X passed.
Accepted facts:
- IU tests b/c/f are live-proven and DOT-callable.
- IU tests d/e/f-enable passed under governed ROLLBACK-only suite.
- Bounded gate protocol is live and used safely.
- No committed production mutation occurred in d/e/f suite.
- Remaining blockers are production-hardening, not basic capability.
Scaling lesson
The 250000X macro completed in ~32 minutes. This confirms the user’s point: recent prompts are still undersized. The next macro should combine all remaining IU production-hardening items into one larger live-apply bundle instead of running isolated 60000X steps.
Next macro direction
Run:
IU_PRODUCTION_HARDENING_AND_DURABLE_GOVERNED_RUN_BUNDLE_500000X
Purpose:
- transform rollback-only proof into one committed, sovereign-approved, durable governed run;
- exercise DLQ replay;
- harden birth-gate L1 from pilot warn toward production block policy;
- integrate piece_event_runtime.emit_enabled into gate protocol or explicitly justify an equivalent safety path;
- build TD-P1 review_decision row-builder or authority pack;
- reconcile IU completion state and 4 Mothers gate.
Expected posture
This macro may perform governed production-like writes only if all Hard Gate 0 / approval / rollback / isolation conditions pass. It must not start 4 Mothers. It must preserve vector and review bypass never-flip rules.
If any branch is unsafe, complete the safe branches and classify the rest exactly.