KB-202D

IP Content Work — 11 Final Summary

3 min read Revision 1
information-piecefinal-summary2026-06-04

11 — Final Summary

Macro: INFORMATION_PIECE_CONTENT_WORK_ON_TOPIC_AND_PROCESS_SURFACES Date: 2026-06-04 · Mode: EXECUTION_MODE · Status: PARTIAL (all safe branches done; owner/legal only)

What was asked

Move from "Topic Axis and Process Axis are live candidate surfaces" to "information-piece work has a usable Topic × Process map, document backlog, workflow implications, automation pilot, and UI/API requirements." Use both surfaces together; do not wait for or fake owner ratification.

What was delivered

  • A. Joint Topic × Process map — LIVE view v_information_piece_topic_process_map (11 classified relations) + matrix (doc 02).
  • B. Content map — all 7 topic candidates as content packages (doc 03).
  • C. Process map — all 5 pilot process candidates + the Type-1 family (doc 04).
  • D. Cross-links — topic→IU, IU→document, topic→process, process→DOT/script, process→trigger/queue/event, process→IU/SOP, topic/process→automation route (docs 02–06).
  • E. Document backlog — D1..D10 prioritised (doc 05).
  • F. 4 Mothers — MOW/MOT/MOIT/template/event implications (doc 06).
  • G. Automation pilot — scored; primary = knowledge_graph content-map, backup = cut_pipeline (doc 07).
  • H. UI/API — 6 routes + 8 components, patch-ready, 1 backend live (doc 08).
  • I. Next macro — INFORMATION_PIECE_DOCUMENT_BUILDING_FROM_TOPIC_PROCESS_MAP (doc 10).

The decisive finding

knowledge_graph is the convergence hub on both axes. All 16 topic IUs are sections of dieu39-knowledge-graph-law.md; the law's own #7-36-dot-kg section (IU 10649925) is the textual bridge to the 18 dot-kg-* process DOTs. Content (KG law) and process (dot-kg DOTs) are one domain seen through two axes. The map turned this latent fact into a queryable relation and a clear pilot.

Live mutation

1 object: v_information_piece_topic_process_map (read-only view, 11 rows). 0 births (1,158,098 before == after; rehearsed net-zero; RO read-back PASS). Three further candidate views consciously kept as KB docs to avoid DDL churn (doc 09).

Numbers (live 2026-06-04)

AX-TOPIC/AX-PROCESS = CANDIDATE · axis_assignment 25/7 · topics 7 (KG 10, arch 5, dot_trigger 3, governance 3, workflow 2, cut_pipeline 1, render_pipeline 1) · process inventory 60 (Type1 57 / Type2 1 / Type3 2; dot-kg 18, TAC 15, COL 4) · cut_pipeline 13 jobs (7 stuck, worker disabled) · IU 219 · iu_relation 60 · kdocs 5,778 · uedges 2,199 · approvals 225 (14 AXR-TOPIC pending) · taxonomy 58 (FAC-08 0 nodes) · births 1,158,098.

Compliance

No forbidden action. No promotion, no taxonomy node, no approval approved, no source-tag change, no IU edit, no workflow execution, no Nuxt count math, no hardcoded levels, DAG kept many-to-many.

Next

Primary: INFORMATION_PIECE_DOCUMENT_BUILDING_FROM_TOPIC_PROCESS_MAP (proceeds now, owner-free). Parallel owner/operator: UI deploy, AXR-TOPIC drain, cut_pipeline registration, queue-worker enable.

Back to Knowledge Hub knowledge/dev/reports/architecture/information-piece-content-work-on-topic-process-surfaces-2026-06-04/11-final-summary.md