KB-7248

IP Content Work — 05 Document-Building Backlog

4 min read Revision 1
information-piecedocument-backlogworkstream-d2026-06-04

05 — Document-Building Backlog (Workstream D)

Topic × Process map → prioritised document-building backlog. No final documents created (forbidden unless explicitly safe); this is the backlog from which the next macro builds.

Document types needed

policy · process/SOP · technical design · UI/API guide · automation runbook · governance review packet · training/operating guide.

Backlog (prioritised)

# proposed title type source IUs related process required substrate missing evidence priority owner/reviewer
D1 Knowledge Graph — Curated Cluster (Điều-39 consolidated) technical design all 10 KG IUs KG_DOT_CLUSTER doc-template; topic node (FAC-08) template not selected; node unborn P1 GOV-COUNCIL + KG content owner
D2 dot-kg- Process Family — SOP & Operating Guide* process/SOP 10649925 (#7-36-dot-kg) KG_DOT_CLUSTER (18 DOTs) dot_tools specs per-DOT run cadence/SLA undocumented P1 GOV-DOT
D3 cut_pipeline — Process Design & Runbook technical design + runbook d933ec87 (#6-10-quy-trinh) CUT_PIPELINE job_queue schema; worker config UNBORN; no IU-SOP; worker disabled P1 GOV-MOW
D4 AX-TOPIC / AX-PROCESS — Governance Review Packet governance review packet topic-axis pipeline 14 AXR-TOPIC rows; gov-gap views owner ratification (Điều-XX/32) P2 GOV-COUNCIL + owner
D5 Approval Workflow & Birth-Gate — SOP (auto-approve hazard) process/SOP 1cded144, e5d9bed3 APPROVAL_WF apr triggers; pg_trigger action='add' auto-approve undocumented for users P2 GOV-COUNCIL
D6 Architecture & Tech-Debt Note (KG) technical design architecture 5 IUs KG_DOT_CLUSTER (inferred) KG-law arch sections P2 architecture owner
D7 Topic × Process Content-Map — UI/API Guide UI/API guide v_information_piece_topic_process_map; 6 routes (doc 08) UI not deployed P2 frontend + RP owner
D8 Pipeline Taxonomy Note (cut vs render vs workflow) policy/decision d933ec87, 620f7646, f17d8fda CUT_PIPELINE sibling-token analysis render process object missing P3 GOV-COUNCIL
D9 Governance topic — Policy policy governance 3 IUs APPROVAL_WF thin evidence P3 GOV-COUNCIL
D10 Automation Pilot Runbook (KG content-map) automation runbook KG IUs KG_DOT_CLUSTER + APPROVAL_WF doc 07 pilot scope targets (template/workflow) not created P2 GOV-DOT + GOV-COUNCIL

Clusters → documents

  • KG cluster (knowledge_graph + architecture topics + 18 dot-kg processes): D1, D2, D6, D10 — the densest, highest-value cluster; the pilot.
  • Pipeline cluster (workflow + cut_pipeline + render_pipeline topics + cut process): D3, D8.
  • Governance cluster (governance topic + approval/topic-axis processes): D4, D5, D9.
  • Cross-cutting: D7 (UI/API).

P1 first: D1 (KG cluster) → D2 (dot-kg SOP) → D3 (cut_pipeline runbook). These three turn the map's strongest convergence into working content. D1+D2 are the pilot deliverables.

Safety

No final document built. Backlog is a planning artifact. Building D1/D2 in the next macro requires: doc-template selection (AXR-TOPIC-14) and/or FAC-08 node (AXR-TOPIC-10) for live linkage — but the prose drafts can be authored now without promotion (mapping/authoring ≠ promotion), then linked after owner approval.

Back to Knowledge Hub knowledge/dev/reports/architecture/information-piece-content-work-on-topic-process-surfaces-2026-06-04/05-document-building-backlog.md