KB-FDA1
09 — Next Macro Decision
2 min read Revision 1
reportnext-macro2026-06-04
09 — Next Macro Decision
Chosen next macro
AX_TRIGGER_CANON_PREP_AND_OWNER_DRAIN_AND_FIRST_OFFICIAL_PROCESS_AND_REALRUN_LADDER —
a 5–6 phase macro that continues every open branch without requiring the agent to hold authority.
Phases
- A — Owner-drain execution surface: when a president vote lands on any PROC-OWN, drive the post-vote handler → deliberate canon step → verify official RP changes. Until then, keep fail-closed.
- B — AX-TRIGGER canon prep: owner-gate packet for the trigger axis (525 triggers, 0 owned); classify the 408 infra DB triggers (which need process ownership vs stay infra); host-trigger adapter spec for the 77 unmanaged.
- C — job:cut first-official-process execution (post PROC-OWN-03): run the canon INSERT under a real vote; verify RP 0→1; audit births.
- D — dot:kg REAL_RUN ladder (post-authority): define + record the verified threshold (D16),
prepare the REAL_RUN pair, hold execution until
real_run_enabledflip is authorized. - E — UI deploy follow-through: operator applies the handoff packet on a clean checkout, resolves the 17/13 divergence, builds, PRs, deploys; agent verifies routes post-deploy.
- F — Production readiness + content D11–D17 + reports.
Why this shape
The trigger axis is now visible but ungoverned — it is the next-largest safe-engineering frontier (read-only substrate done; canon prep is the next safe step). Everything else is authority-gated and becomes executable the moment a single president vote (PROC-OWN-01) lands.
Exact next action
President approves PROC-OWN-01 (assign AX-PROCESS owner; suggest GOV-COUNCIL). That single vote unblocks 02/03/05 handlers and the job:cut officialization chain. No engineering blocker remains.