KB-5A12

GPT Direction — G1 Reversibility Solved → Activation Closure Campaign (2026-05-29)

3 min read Revision 1
gptg1candidate-registryreversibilityphase0prompt-quality2026-05-29

GPT Direction — After G1 Reversibility Blocker Solved

Date: 2026-05-29 Reviewer: GPT Council via Web Connector fallback

Accepted state from Agent report

G1 reversibility blocker is solved technically:

  • Full BEGIN..ROLLBACK dress rehearsal birthed field_registry, input_form_registry, tier_registry through CREATE TABLE + collection/table/meta_catalog path.
  • fn_pre_birth_check passed 5/5 for all three.
  • In-transaction cascade was observed and post-rollback returned to baseline.
  • The previous assumption that meta_catalog cascade made reversibility unsolved was corrected.
  • A real defect was found: v_registry_counts_id_seq lagged max(id); setval correction was applied as a benign sequence state change.
  • Agent-caused orphan sessions were detected and terminated; baseline remained intact.

Prompt quality lesson

The previous prompts over-emphasized artificial X-scale/time pressure. The Agent correctly pushed back when the prompt incentivized mutation-for-volume. Future prompts must follow open-goal discipline:

  • set objective, boundaries, evidence, and forbidden actions;
  • do not force fake live changes;
  • maximize all genuinely safe branches;
  • if human/sovereign authority is required, produce final activation pack rather than asking mid-run;
  • default decisions must be specified so the Agent does not ask the user.

Remaining G1 blockers

  • B-2 production column schemas: previous rehearsal used stubs.
  • B-3 PREFIX-NNN code assignment.
  • B-4 tier_registry has no owning Mother; this is a Đ7/Đ37 no-orphan-governance issue.
  • B-5 Đ32 enacting-law + cross-sign approval cannot be self-minted by Agent.
  • P-1 characterize the +52 birth cascade before any commit, because it affects hard rollback/retire path.

Next macro direction

Run one concrete but large open-goal campaign:

G1_CANDIDATE_REGISTRY_ACTIVATION_CLOSURE_AND_PHASE0_GATE_PREP_CAMPAIGN

Purpose:

  • Close all agent-solvable G1 blockers without requiring user questions.
  • Produce production-grade schemas for field/input_form/tier registries.
  • Decide tier ownership by law analysis, or produce a final no-orphan authority decision pack.
  • Define PREFIX-NNN/meta_catalog code assignment path.
  • Characterize the +52 birth cascade precisely.
  • Prepare final human Đ32 activation pack with exact commands, approvals, rollback/retire path, and no hidden decisions.
  • In parallel, update Phase 0 gate board and prepare next actions for G2/G3/G4 that do not require human approval.

Critical rule

Do not force a committed Candidate Registry birth until all B-2/B-3/B-4/B-5/P-1 are closed and the required human/sovereign approval exists. The next macro should remove technical ambiguity, not bypass authority.

Back to Knowledge Hub knowledge/dev/reports/architecture/g1-reversibility-solved-gpt-next-activation-closure-campaign-2026-05-29.md