20 — Final Summary
20 — Final Summary
Status: PARTIAL — all 24 phases executed; every authority-independent branch closed and re-verified live; only true authority remains. NO engineering blocker.
What happened
Re-verified the entire system from LIVE production (dual-path query_pg RO == ssh→docker→psql, headline 25|0|5|0|0|1194790). Confirmed zero engineering drift (+63 births = background). Confirmed no authority landed. Re-proved every fail-closed gate (5 AX-PROCESS handlers BLOCKED_NO_PRESIDENT_VOTE; dot:kg preflight REALRUN_BLOCKED_MULTI_GATE 4GO/5BLOCK; AX-TRIGGER absent; events 0/7). Proved UI branch integrity (614b668, 2 files/+159, clean tree). Produced final PR package, operator deploy packet, and full acceptance report set. No DB mutation, no canon, no git push, no fake authority.
Phase outcomes
- A drift: NO DRIFT · B authority: NONE landed · C UI: PROVEN · D PR: FINAL PACKAGE (no creds) · E deploy: operator packet · F AX-PROCESS dry-run: fail-closed · G officialization: BLOCKED · H job:cut: BLOCKED (READY_OWNER) · I AX-TRIGGER dry-run: preview · J trigger canon: BLOCKED · K Process×Trigger: DONE (12-row ledger) · L/M/N dot:kg: BLOCKED · O split: package · P/Q events: BLOCKED · R scorecard: 11 dims final · S monitoring: GREEN · T content: FINAL · U risk: 0 eng · V runbook: final · W next: HANDOFF/PAUSE · X safety: PASS.
The four human moves
- President vote PROC-OWN-01→02→03→05 (+04). 2. UI operator push/PR/merge/deploy. 3. dot:kg owner+config+contract→REAL_RUN. 4. AX-TRIGGER owner canon.
Next macro
SESSION_HANDOFF_AND_PAUSE_UNTIL_AUTHORITY — execution macros fire automatically when authority lands.