KB-70E7

15 — Content / Handoff Finalization

2 min read Revision 1

15 — Content / Handoff Finalization (Phase T)

Content state

The 13 content docs under knowledge/dev/content/process-trigger-axis/ (01..13) remain current SSOT — operator manuals, decision packets, and backlog. No source Information-Unit (IU) was edited (forbidden). This run added the acceptance report package (this directory) + the 2026-06-05 checkpoint.

Handoff docs current after this run

  • Operator guide — content/process-trigger-axis (unchanged, current).
  • Vote guide — see 17-president-operator-onepage-runbook.md (this package) for the one-page version.
  • UI PR/deploy guide04-ui-pr-push-or-package.md + 05-ui-deploy-path.md.
  • dot:kg guide10-dotkg-realrun-preflight.md + 11-dotkg-10process-split.md.
  • Trigger canon guide08-ax-trigger-dryrun-canon.md.
  • Session handoff20-final-summary.md + checkpoint.

Verdict

Handoff FINAL. No new content gaps. No source-IU edit. All operator-facing guidance points to a single, copy-paste-ready action set.

Back to Knowledge Hub knowledge/dev/reports/architecture/final-officialization-ui-pr-dotkg-realrun-rp-acceptance-2026-06-05/15-content-handoff-finalization.md