KB-1B84

13 — RP Final Acceptance Scorecard

2 min read Revision 1

13 — RP Final Acceptance Scorecard (Phase R)

Live v_total_final_acceptance_scorecard (11 dimensions, 2026-06-05):

# Dimension Status Note
1 process_axis_engineering DONE post-vote + candidate handlers fail-closed; surfaces live; frontier complete
2 trigger_axis_engineering DONE 525 DB + 77 host; 7 read-only surfaces; AX-TRIGGER not faked
3 official_rp BLOCKED_AUTHORITY 0/453 until PROC-OWN-01..03 president vote
4 president_votes BLOCKED_AUTHORITY PROC-OWN-01..05 await vote (0)
5 governance_ownership BLOCKED_AUTHORITY ownership 0
6 jobcut READY_OWNER sole verified (8 members); one vote from first official process
7 dotkg_realrun BLOCKED_REALRUN 2 DRY_RUN / 4 SIM; preflight REALRUN_BLOCKED_MULTI_GATE
8 process_events BLOCKED_AUTHORITY 0/7 active until PROC-OWN-05
9 ui_packet BLOCKED_UI_GIT main diverged; build/lint-clean; operator handoff
10 content DONE manuals + decision packets + backlog published
11 production_readiness READY_OPERATOR scanner timer active; executor healthy; dashboards live

Acceptance summary

  • Engineering & content: DONE (3 dims).
  • Production: READY_OPERATOR.
  • job:cut: READY_OWNER.
  • 6 dims BLOCKED — all authority/operator, none engineering.

Official RP acceptance (0/453 → >0) is reachable in one deterministic chain: president vote PROC-OWN-01→02→03. No engineering work stands between the current state and acceptance.

Back to Knowledge Hub knowledge/dev/reports/architecture/final-officialization-ui-pr-dotkg-realrun-rp-acceptance-2026-06-05/13-rp-final-scorecard.md