KB-30D3

00 — README First

2 min read Revision 1

00 — README First

Run: FINAL_OFFICIALIZATION_UI_PR_DEPLOY_DOTKG_REALRUN_TRIGGER_CANON_CONTENT_ACCEPTANCE (2026-06-05) Mode: EXECUTION_MODE (autonomous). Status: PARTIAL — all authority-independent branches closed & re-verified live; only authority remains.

What this run did

Re-verified the entire system state from LIVE production via dual-path (query_pg RO + ssh→docker→psql), confirmed zero drift, confirmed no authority has landed, re-proved every fail-closed gate, and republished the final acceptance package. No DB mutation, no canon, no git push, no fake authority.

One-line truth

The engineering frontier is complete and idle-safe. Nothing technical blocks officialization. The next move is a human one.

The only 4 human/operator actions left

  1. President vote PROC-OWN-01..05 → unblocks AX-PROCESS canon, official RP, job:cut, events.
  2. UI operator → push feat/process-axis-dashboard, open PR, merge, redeploy nuxt.
  3. dot:kg owner (PROC-OWN-04) + dot_config flips + contract promotion → unblocks REAL_RUN.
  4. AX-TRIGGER owner (Dieu-39) → unblocks trigger axis canon.

Read order

  • 01 dual-path live drift audit
  • 02 authority re-check
  • 03 UI branch integrity → 04 PR package → 05 deploy path
  • 0608 AX-PROCESS / job:cut / AX-TRIGGER dry-runs
  • 09 Process×Trigger actionability
  • 1011 dot:kg preflight + 10-process split
  • 12 event activation
  • 13 RP final scorecard
  • 14 production monitoring
  • 15 content/handoff · 16 risk ledger · 17 one-page runbook
  • 18 next macro · 19 safety audit · 20 final summary · 21 MCP-readable checkpoint

Authority of evidence

Live DB/SSH evidence wins over any prior report. Every number here was read from prod on 2026-06-05, both paths agreeing (25|0|5|0|0|1194790).

Back to Knowledge Hub knowledge/dev/reports/architecture/final-officialization-ui-pr-dotkg-realrun-rp-acceptance-2026-06-05/00-readme-first.md