KB-7C04

17 · Next Macro Compression

2 min read Revision 1

17 · Next Macro Compression (2026-06-05)

Decision

Chosen next macro: FINAL_OFFICIALIZATION_UI_DEPLOY_DOTKG_REALRUN_AND_RP_ACCEPTANCE (option 1).

Rationale (per decision rules)

  • No president vote exists yet → the next macro must keep content/UI/dotkg prep in parallel while officialization waits on authority. Option 1 does exactly this: it executes officialization handlers if/when votes appear, deploys UI if operator authority is granted, and otherwise continues all authority-independent verification + acceptance tracking.
  • UI branch is ready → include deploy (push/PR/smoke) the moment operator authority lands.
  • All authority-independent engineering is done → the next macro is effectively "final officialization + the operator/authority actions," not new engineering. It is final-scale (all axes + dot:kg + RP acceptance), not a small macro.

Why not the others

  • Option 2 (UI_PR_DEPLOY_AND_OWNER_OFFICIALIZATION_PARALLEL) — subset of option 1.
  • Option 3 (DOTKG_REALRUN_TRIGGER_CANON_AND_INFORMATION_PIECE) — omits UI deploy + AX-PROCESS officialization, which are now the highest-value flips.
  • Option 4 (PRESIDENT_VOTE_EXECUTION_AND_ALL_AXES) — assumes votes already cast; they are not.

Shape of the next run

  1. Dual-path drift re-audit.
  2. If PROC-OWN votes present → execute handlers (official RP, events, dot:kg owner) and verify flips.
  3. If UI operator authority present → push/PR/deploy + smoke.
  4. If dot:kg config flipped → first correlated REAL_RUN + verify.
  5. AX-TRIGGER canon if owner assigned.
  6. Re-score acceptance; publish final acceptance checkpoint.
  7. Otherwise: continue parallel prep, D11/D14 backlog (host adapters + UI ledger panel), content.
Back to Knowledge Hub knowledge/dev/reports/architecture/authority-independent-total-closeout-ui-pr-content-dotkg-trigger-rp-acceptance-2026-06-04/17-next-macro-compression.md