KB-5E06

05 - O4 Resume Idempotency Result

2 min read Revision 1
dot-iu-cutterv0.6O4resumeidempotency

05 - O4 Resume / Idempotency Result

G4 proof objective

Prove dry-run resume and idempotency behavior without production mutation.

Resume sequence

  1. Initial dry-run cut reached SG1 pause:
state=awaiting_cut_authorization
stop_code=STOP_APPROVAL_REQUIRED
  1. Local SG1 approval doc was supplied to runner.resume:
state=awaiting_lifecycle_authorization
stop_code=STOP_APPROVAL_REQUIRED
  1. Local SG2 approval doc was supplied to runner.resume:
state=closeout_reported
stop_code=None
  1. Closed-out run was resumed again without approval:
state=closeout_reported
stop_code=None

Interpretation: closed-out resume is idempotent by design and did not re-run production work.

State-machine evidence

All phases passed exactly through the expected O2/O4 dry-run path:

source_pin -> mark -> cutplan -> pre_write_backup -> grant_probe -> SG1 pause -> cut_leg_a -> structural_verify -> leg_b_record -> write_verify -> SG2 pause -> lifecycle_enact -> closeout

Authority evidence

  • SG1 and SG2 approval docs were local dry-run files under the temporary sidecar area.
  • SG2 carried a synthetic dry-run review decision UUID: 11675949-0a31-4582-a5d9-15147b13fc66.
  • No production review_decision row was created or updated.
  • No production lifecycle mutation was attempted.

Reporting evidence

  • SG1 request doc generated.
  • SG2 request doc generated.
  • Closeout doc generated.
  • Runs index generated locally by DryRunReporter.

Non-mutation evidence

The live ICX-CONST counts before and after dry-run were identical:

icx_total: 60 -> 60
icx_draft: 0 -> 0
icx_enacted: 60 -> 60
uv_enacted_at_nonnull: 60 -> 60
lifecycle_log_rows: 60 -> 60

Result

G4 PASS.

Back to Knowledge Hub knowledge/dev/laws/dieu44-trien-khai/v0.6-orchestrator-o4-live-dryrun-orchestration/05-resume-idempotency-result-2026-05-21.md