KB-746A

O8B reconcile-deploy live wiring (Contabo) — 07-postdeploy-live-wiring-proof

2 min read Revision 1
dieu44iu-cutterv0.6o8breconcile-deploylive-execution-wiringblockedcontabo

O8B Report 07 — Postdeploy live-wiring proof (G6) — NOT EXECUTED

  • macro: v0.6-o8b-reconcile-deploy-live-wiring
  • date_utc: 2026-05-21 · host: vmi3080463 (Contabo)
  • gate covered: G6 Contabo postdeploy proofNOT EXECUTED

1. Why not executed

G6 proves properties of an updated deployed v0.6. No deploy happened (Report 06), so there is nothing post-deploy to prove. The deployed iu-cutter-v0.6 is still the pre-O8A baseline and has no live-wiring seam.

2. Pre-deploy evidence the wiring is correct (staging copy)

Although G6 cannot run, the O8A staging change set was exercised on Contabo (Report 04) and demonstrates the properties G6 would later assert on the deployed tree:

Property G6 would prove Pre-deploy evidence (staging copy)
execution_enabled == False __execution_enabled__ = False in staging __init__.py; unchanged
Mode.LIVE refused before mutation when kill-switch OFF test_all_five_phases_refuse_and_do_not_touch_adapter PASS — refuse_if_killswitch_off raises before any adapter method
Mode.LIVE wired to the live adapter seam, not the simulator five *_live_routes_to_adapter tests PASS; test_live_phase_without_adapter_fails_closed PASS — require_live_adapter raises, never simulate_*
row counts unchanged tests use a fake DB; production=REFUSED; the production DB is never connected

This is sandbox evidence on the staging copy, explicitly not a postdeploy proof. The genuine G6 proof must be run by the follow-up macro against the actual updated deployed tree.

3. Verdict

g6: NOT EXECUTED — nothing deployed. No production mutation; row counts
    untouched (the production DB was never connected this macro).
Back to Knowledge Hub knowledge/dev/laws/dieu44-trien-khai/v0.6-o8b-reconcile-deploy-live-wiring/07-postdeploy-live-wiring-proof.md