KB-67C7

Final Phase 7 Enactment Report

3 min read Revision 1
dieu44phase7final-reportblocked

Final Phase 7 Enactment Report

final_result: B — BLOCKED_WITH_EXACT_PHASE7_GAP
blocked_gate: G2 — review_decision / approval
exact_gap: no valid NEW enactment-specific cutter_governance.review_decision exists in production
production_mutation: none
fn_iu_enact_calls: 0
phase7_enactment: NOT_RUN
reports_uploaded: 7 required reports plus 00 KB upload probe

Three mission declarations

  1. Vĩnh viễn: lifecycle enactment must be backed by canonical fn_iu_enact and a governance-linked review_decision, not an ad hoc row mutation.
  2. Nhầm được không: the gate blocks enactment if the required new review_decision is missing or if someone tries to reuse the CUT creation approval.
  3. 100% tự động: once the governance artifact exists, the same preflight and single-transaction canonical function path can run without manual row edits.

Evidence summary

G0 PASS:

  • KB read worked via search_knowledge and package reads.
  • KB upload worked: 00-kb-upload-probe-2026-05-20.md created.

G1 PASS:

icx_const_status|60|0|60|draft
totals|158|165|0|0|0|0
fn_iu_enact md5 = 6ca9bc39e2d2be93dd8a71739fa80dc4
fn_iu_apply_edit_draft md5 = 42e96b6c9e81a2d0a28b30644d178a26
allowed_marker_values = fn_iu_create,fn_iu_apply_edit_draft,fn_iu_enact

G2 FAIL-CLOSED:

review_decision_targeted_search excluding CUT approval ID: 0 rows
review_decision_total: 2
only real CUT approval row: 29c88a7b-60f7-41bd-af45-43cc9b9f41c0

Package governance forbids using the CUT approval row for enactment because it approved CREATION, not ENACTMENT. No package authority was found to create a sovereign enactment approval manually inside this execution session.

Final no-op state

final_noop_state|60|60|0|0|0|2

Boundaries honored

  • No direct lifecycle UPDATE.
  • No fn_iu_enact call on the 60 ICX-CONST rows.
  • No draft -> enacted mutation.
  • No DDL.
  • No deploy/restart/merge/push/tag.
  • No hard delete.
  • No source_document/source_version mutation.

Route

STOP and route to GPT/User. Required next prerequisite is a new governed review_decision approval for Phase 7 enactment of the 60 ICX-CONST rows, distinct from 29c88a7b-60f7-41bd-af45-43cc9b9f41c0.

Back to Knowledge Hub knowledge/dev/laws/dieu44-trien-khai/v0.5-lifecycle-phase7-enactment-execution/07-final-phase7-enactment-report-2026-05-20.md