KB-2DBC
Final Phase 7 Rerun Enactment Report
3 min read Revision 1
dieu44phase7rerunfinal-reportpass
Final Phase 7 Rerun Enactment Report
final_result: A — PHASE7_ENACTMENT_PASS
phase7_review_decision_id: af323ae3-39a5-4958-95b8-5acfba8f6984
cut_approval_not_reused_as_enactment_id: true
canonical_function_used: public.fn_iu_enact(text,text,uuid,text,uuid,text,text,boolean)
fn_iu_enact_calls_real: 60
icx_total: 60
icx_draft: 0
icx_enacted: 60
unit_version_enacted_at_nonnull_for_icx: 60
lifecycle_log_rows: 60
reports_uploaded: 7 required reports plus 00 KB upload probe
3 câu Tuyên ngôn
- Vĩnh viễn: enactment is now encoded through the canonical lifecycle function and audit log, not ad hoc row editing.
- Nhầm được không: the old CUT approval ID was rejected as an enactment ID; the system now has a distinct Phase 7 review_decision and immutable enacted-state triggers remain enabled.
- 100% tự động: future enactment checks can verify state from PG counts, function fingerprints, log linkage, and review_decision ID without manual interpretation.
Gate summary
- G0 PASS: KB read/upload worked; SSOT and required reports/rulings read.
- G1 PASS: live state matched preconditions before rerun: 60 draft, 0 enacted, log 0, fingerprints matched.
- G2 PASS: created new review_decision
af323ae3-39a5-4958-95b8-5acfba8f6984viacutter_exec; distinct from CUT approval29c88a7b-60f7-41bd-af45-43cc9b9f41c0. - G3 PASS: fresh backup created and restore-tested.
- G4 PASS: dry-run via canonical
fn_iu_enactreturnedplan_ok=60, no persisted mutation. - G5 PASS: one controlled transaction enacted 60 rows; distribution
enacted=60; committed. - G6 PASS: post-verification matched expected lifecycle/log state.
Key evidence
created_phase7_review_decision|af323ae3-39a5-4958-95b8-5acfba8f6984|lifecycle_phase7_enactment|phase7_lifecycle_enactment:ICX-CONST|decided|approve
backup_sha256=076213737cac72174a42a508eacf6e4ac24f8cd52257b1efc9cf8ab1a4cdb5ae
dry_run_distribution|plan_ok|60
phase7_enact_distribution|enacted|60
post_counts|158|165|60|0|60|60|60|60
post_log_shape|60|60|60|60|60|2026-05-20 09:04:13.57337+00|2026-05-20 09:04:13.57337+00
Boundaries honored
- Did not use CUT approval as enactment review_decision ID.
- Did not direct UPDATE lifecycle.
- Did not bypass
fn_iu_enact. - Did not alter
fn_iu_enact. - Did not run unapproved DDL.
- Did not deploy/restart.
- Did not merge/push/tag.
- Did not hard-delete.
- Did not mutate source_document/source_version; those columns are absent in live IU/UV schema.
OR / TD note
No OR/TD update was needed: this was a governed one-time lifecycle enactment execution using existing canonical infrastructure and reports, not a rule/process change.
STOP and route to GPT/User.