dot-iu-cutter v0.2 — Next-Phase Routing Note (2026-05-16)

3 min read Revision 1
dot-iu-cutterdieu44v0.2planningroutingbr-6p0-2

dot-iu-cutter v0.2 — Next-Phase Routing Note

Path: knowledge/dev/laws/dieu44-trien-khai/v0.2-planning/dot-iu-cutter-v0.2-next-phase-routing-note-2026-05-16.md Date: 2026-05-16 Status of this note: ROUTING / PLANNING ONLY — no action started, no design begun.


1. Current Status

Milestone State
v0.1 P0 schema (5 cutter_governance tables) LIVE in production (2026-05-15)
v0.2 Phase α (authority + canonical_address_format_version cols on public/sandbox logical_unit; cutter_governance.canonical_address_alias) LIVE in production (2026-05-16), GPT-ratified PASS, backup-verified

Phase α is closed out. Backup verification = PASS (restore-tested). Production stable.

2. Pending Items (not started)

Item Description
BR-6 Split/merge technical-debt (TD) absorption — reconcile split/merge semantics before manifest design depends on them
P0-2 cutter_governance.manifest_envelope + manifest_unit_block (manifest design)
P0-6 cutter_governance.review_decision
P0-5 remainder decision_backlog_history, decision_backlog_dependency, sweep_log

All four lack design/dry-run evidence and are unauthorized until separately gated.

Absorb BR-6 (split/merge TD) BEFORE starting P0-2 manifest design.

Rationale: the manifest model (manifest_envelope / manifest_unit_block) encodes how units are grouped and addressed. If split/merge TD is unresolved, the manifest schema risks being designed against semantics that BR-6 will later change, forcing a re-cut of P0-2. Absorbing BR-6 first de-risks the manifest design and avoids rework.

Suggested ordering:

  1. BR-6 split/merge TD absorption (design + dry-run, gated)
  2. P0-2 manifest_envelope / manifest_unit_block (design → dry-run → command-review → ratify → execute)
  3. P0-6 review_decision
  4. P0-5 remainder

4. Optional Alternate Route

If the User prefers to prioritize connector / integration work over schema progression: MCP server Path B — wire the MCP server / connector layer against the now-live Phase α columns. This is an alternative track, not a prerequisite, and would defer BR-6/P0-2.

5. Boundary

  • This note starts no work. It records routing options only.
  • P0-2 / manifest design / further migration remain unauthorized.
  • The next gated step requires its own design → dry-run → command-review → GPT ratify → explicit User execution prompt in a separate session. Operator self-advance PROHIBITED.

Recommended next route: BR-6 split/merge TD absorption first, then P0-2 manifest design.

Back to Knowledge Hub knowledge/dev/laws/dieu44-trien-khai/v0.2-planning/dot-iu-cutter-v0.2-next-phase-routing-note-2026-05-16.md