dot-iu-cutter v0.2 — Phase α Production Handoff / Status (2026-05-16)
dot-iu-cutter v0.2 — Phase α Production Handoff / Status
Path: knowledge/dev/laws/dieu44-trien-khai/v0.2-execution/dot-iu-cutter-v0.2-phase-alpha-production-handoff-status-2026-05-16.md
Date: 2026-05-16
Author: dot-iu-cutter operator (closeout session)
Builds on: Phase α production execution report (2026-05-16) + GPT review verdict
Scope of this document: CLOSEOUT / HANDOFF ONLY — no migration, no DDL, no manifest design.
1. Phase α Final Status
| Field | Value |
|---|---|
phase_alpha_production_execution_status |
PASS (GPT-ratified) |
execution_status |
success |
rollback_executed |
false |
scope_expansion |
false |
non_scope_performed |
false |
| State | v0.2 Phase α is LIVE in production |
GPT reviewed the Phase α Production Execution Report and returned PASS. The migration
applied the frozen revision-2 (r2) DDL verbatim
(dot-iu-cutter-v0.2-phase-alpha-r2.sql, sha256 65533e05…893fe3) in a single committed
transaction (C-07 psql exit 0, status COMMITTED). No rollback was triggered (C-09 NOT
triggered). Scope was exactly the authorized Phase α subset.
2. Production Objects Added
Target DB: directus on container postgres (PostgreSQL 16.13), VPS 38.242.240.89.
2.1 public.tac_logical_unit — new columns
authority— distribution:draft = 86,enacted = 0,runtime = 0,null = 0canonical_address_format_version— distribution:canonical-address-v1 = 86
2.2 sandbox_tac.logical_unit — new columns
authority— distribution:null = 76canonical_address_format_version— distribution:canonical-address-v1 = 76
2.3 cutter_governance.canonical_address_alias — new table
- Rows = 0 (empty, as authorized — no alias writes performed)
- 4 indexes created
cutter_governanceschema now holds 6 tables = 5 v0.1 tables (decision_backlog_entry,dot_pair_signature,cut_change_set,cut_change_set_affected_row,verify_result) +canonical_address_alias
3. Verification Summary (from production execution)
| Gate | Result |
|---|---|
| C-06 preflight | 10/10 PASS |
| C-07 migration | psql exit 0, UPDATE 86, status COMMITTED |
C-08 verify (verify_alpha.sql) |
PASS — 17 verify-pass lines |
| Schema DDL diff | added = 6, removed = 0 |
updated_at rows changed |
86 / 86 (BR-4 backfill) |
| C-09 rollback | NOT triggered |
All results match the dry-run (pg-dry-run-v0.2-phase-alpha-2026-05-16) exactly.
4. Accepted updated_at Side Effect
The migration bumped updated_at on all 86 public.tac_logical_unit rows
(pre distinct = 3, range 2026-04-29…2026-04-30 → post distinct = 1,
2026-05-16 02:27:27.789235+00). This is accepted as the expected BR-4 backfill side
effect: the r2 DDL backfills authority/canonical_address_format_version on existing
rows, which touches updated_at. This pattern is the proof that r2 DDL executed, not
the rejected r1 pattern. No business data values were altered — only the two new columns
were populated and the audit updated_at was bumped.
5. Rollback Status
rollback_executed = false- C-09 rollback path NOT triggered — no rollback was needed.
- The pre-migration safety backup (
phase_alpha_prod_20260516T022657Z.dump, sha256e0b178a9…) remains retained for defence-in-depth, but is not a Phase-α-state backup (taken 2 s before C-07). The Phase-α-state backup is documented in the companion post-execution backup verification report.
6. What Remains UNAUTHORIZED
The following are explicitly out of scope and not authorized:
- Production CUT operations (no INSERT into
cut_change_set) - Production VERIFY operations (no INSERT into
verify_result) - Alias writes (no INSERT into
cutter_governance.canonical_address_alias) - P0-2 manifest design —
manifest_envelope,manifest_unit_block - P0-6
review_decision - Any further migration / DDL
- App / tooling integration (no connector or application wiring against the new columns)
Each requires its own design → dry-run → command-review → GPT ratify → explicit User execution prompt in a separate session. Operator self-advance is PROHIBITED.
7. Dry-Run Environment Status
Both isolated dry-run environments remain UP and are protected (must not be torn down without explicit authorization):
| Container | Image | Status | Volume |
|---|---|---|---|
pg-dry-run-hb05-2026-05-15 |
postgres:16 | UP | pg-dry-run-hb05-2026-05-15-data |
pg-dry-run-v0.2-phase-alpha-2026-05-16 |
postgres:16 | UP | pg-dry-run-v0.2-phase-alpha-2026-05-16-data |
Confirmed still UP after the post-execution backup/restore verification (the restore test used a separate ephemeral container that was created and destroyed by the verification script — neither protected env was touched).
8. Next Recommended Steps
- Backup closeout — see companion document
dot-iu-cutter-v0.2-phase-alpha-post-execution-backup-verification-2026-05-16.md(status: PASS, restore-tested). - Route decision — see
knowledge/dev/laws/dieu44-trien-khai/v0.2-planning/dot-iu-cutter-v0.2-next-phase-routing-note-2026-05-16.md. Recommended route: absorb BR-6 (split/merge TD) before starting P0-2 manifest design. - Do not self-advance into P0-2 / manifest / further migration. Await GPT + explicit User prompt for the next gated step.
Handoff status: COMPLETE — Phase α LIVE, ratified, closed out. No further action authorized.