KB-3FA8

Opus Review — P2 PASS + Next Steps

2 min read Revision 1
dot-119repairp2passnext-steps

Opus Review — P2 PASS + Next Steps

Date: 2026-05-05 | Reviewer: Opus 4.6

P2 PASS

DOT-119 v2.0.0 đã cài và hoạt động:

  • 18/18 smoke tests PASS
  • Metadata-driven: đọc collection_registry, zero hardcode
  • No-clobber: 0 occurrences CREATE OR REPLACE FUNCTION
  • No hardcode hash: 0 occurrences KNOWN_V2_FN_HASH
  • synthetic_capability: pass (IU dry-run OK)
  • fn hash unchanged: 1f729b3571a74963089bb3ef388217f3
  • Trigger count: 30 unchanged
  • v1 backup retained

18b Status

Phase Status
P0 read-only mapping ✅ PASS
P1 DDL + seed + constraints ✅ PASS
P1a schema tool inspection ✅ PASS
P2 script rewrite + smoke ✅ PASS
P3 HC registration ⏸ Pending (defer by default per 18b rev3)

Đề xuất

18b gần hoàn thành. P3 (HC registration) đã thiết kế defer by default.

Hai lựa chọn:

  • A: Soạn P3 prompt, inspect HC legal path, register nếu path rõ, hoặc defer TD. Đóng 18b.
  • B: Skip P3, ghi TD cho HC, đóng 18b. Chuyển sang 18c (IU trigger via DOT-119 v2).

Opus recommend B: HC không blocking. IU trigger mới là mục tiêu — dùng DOT-119 v2 vừa sửa xong để khai sinh information_unit. Đó là lý do ta sửa máy.


Opus review P2 | 2026-05-05 | P2 PASS. Propose skip P3 → 18c.