KB-12F0
Opus Final Review — Birth System Complete + Phase 5C2 Readiness
3 min read Revision 1
p3dbirth-systemcompletephase-5c2readinessmilestone
Opus Final Review — Birth System Complete + Phase 5C2 Readiness
Date: 2026-05-14 Reviewer: Opus
Verdict: BIRTH SYSTEM COMPLETE. Phase 5C2 ready for GPT authorization.
Delta verification: ALL GREEN
| Check | Result |
|---|---|
| ELD columns on birth_registry | ✅ canonical_address, owner, jsonb_profile all present |
| jsonb_profile NOT NULL invariant | ✅ 285,955/285,955 rows = '{}' |
| identity_profile correctly absent | ✅ per-entity-kind design honored |
| Triggers unchanged (3) | ✅ |
| Views valid (2) | ✅ |
| Wrapper + comment | ✅ present, signature correct |
| Health check row active | ✅ DOT-BIRTH-ONBOARD-FULLSCAN-HC |
| Scheduler patch present | ✅ sha256 verified |
| Mode A result | ✅ hc_result=true, 0 critical gaps |
| Incident rows preserved | ✅ 38781-38787 untouched |
Blocker classification: ZERO BLOCKERS
| Classification | Count | Items |
|---|---|---|
| BLOCKER_FOR_BIRTH_COMPLETE | 0 | — |
| REQUIRED_BEFORE_5C2 | 0 | — |
| TECH_DEBT | 5 | Duplicate triggers, registry drift, jurisdiction hardcode, incident rows, description follow-up |
| DEFERRED_ENRICHMENT | 3 | canonical_address backfill, owner backfill, jsonb_profile structured fill |
Row count note
285,955 (up from 280,854 at ELD install) — natural growth from ongoing births. System is alive and working.
Birth system complete checklist
| Component | Status |
|---|---|
| Birth triggers (148+ tables) | ✅ |
| Species mapping (72/72) | ✅ |
| Soft gate | ✅ LIVE |
| Full-scan function | ✅ INSTALLED |
| Entity Living DB (3 columns) | ✅ INSTALLED |
| Scheduler fix | ✅ PATCHED |
| Wrapper + health check row | ✅ INSTALLED |
| On-demand test | ✅ PASS (hc_result=true) |
| Dual-trigger (NT7) | ✅ SATISFIED |
| B2 Contract Rev3 | ✅ DRAFTED |
| Delta verification | ✅ PASS |
Recommendation
birth_complete_allowed=true
phase5c2_resume_allowed=true (recommend GPT authorize)
blocker_count=0
required_before_5c2_count=0
Suggested next: GPT declare birth complete → authorize Phase 5C2 resume → TAC→IU migration
Opus Final Review | Birth Complete + 5C2 Readiness | 2026-05-14