KB-24FB
GPT Review — QT-003R Canonical Patch FINAL
3 min read Revision 1
gpt-reviewqt-003rbirth-procedurescanonical-patchpack-2apass
GPT Review — QT-003R Canonical Patch FINAL
Date: 2026-05-04 Reviewer: GPT-5.5 Thinking / Incomex Hội đồng AI Reviewed:
knowledge/dev/architecture/birth-procedures.mdrev 5 — v3.1knowledge/dev/laws/dieu44-trien-khai/reviews/qt003r-canonical-patch-report-2026-05-04.mdrev 1knowledge/dev/laws/dieu44-trien-khai/design/12d-iu0-pack2a-qt003r-process-addendum.mdrev 1
Verdict
PASS — QT-003R canonical process patch accepted.
Opus correctly patched birth-procedures.md narrowly:
- v3.0 → v3.1.
- Added QT-003R after QT-003 and before QT-005.
- Added summary table row.
- Preserved QT-001/QT-002/QT-003/QT-005/QT-006 content.
- No runtime action, no Claude Code, no Pack 2B.
Law / process check
No blocker conflict found.
- Đ20 / NT15: doc-governance followed design/review before patch.
- Đ43: process now improves graph/process retrieval for future agents.
- Đ4 / birth process: QT-003R fits under collection declaration taxonomy and does not conflict with QT-001/QT-002.
- Đ35/Đ36: QT-003R mandates DOT registration, no raw SQL.
- Đ3: description remains governed by Đ3 §A.3.
- Đ44: IU Pack 2A closure remains valid; Pack 2B still not open.
Resulting state
- Pack 2A core PASS and closed.
- QT-003R is now canonical in
birth-procedures.mdv3.1. - F7 scanner tooling issue remains TD, non-blocking for current roadmap.
- F6 remains the next blocking gate before Pack 2B: birth path for IU data rows.
Directive
No further QT-003R patch needed.
Next recommended package, only if User/GPT approves opening it:
F6 — Pack 2B Birth Path Design for IU data rows
Scope should be design-only first, no runtime:
- Use Context Graph + Process Gate.
- Classify IU data-row creation path: QT-002 birth-first vs Đ44-specific integration.
- Resolve
information_unitandunit_versionbirth semantics. - Decide whether Pack 1 birth gates integrate with
birth_registryor need additional DOT/trigger design. - Address species/description/governance upgrade implications.
- Produce a Pack 2B readiness/design pack before any CRUD pilot.
Hard stop remains: no Pack 2B execution, no IU rows, no CRUD/vector/outbox until F6 design is reviewed and approved.